Acceptance report
Dear customer!
We request your confirmation of properly completed transfer of the machine. Please transmit a
copy of this document - filled out and signed by an authorized company representative - to an
employee of our sales affiliate for forwarding to the manufacturer.
Please check applicable items:
Machine parts checked for shipping damage.
Machine parts checked against delivery note.
Setup of the machine discussed.
Startup of the machine discussed.
Operation of the machine discussed.
Maintenance of the machine discussed.
Electrical voltage checked.
Safety notes discussed.
Trial run performed.
Deficiencies determined.
The machine with the machine designation:
has been checked according to the listed items and has been handed over properly.
City, Date
Name, Position
Company stamp, Signature
(Instructed person)
Содержание R500
Страница 1: ...R500 Operation Manual 8057 Operation Manual 8057_4 0_EN 05 2023 ENGLISH...
Страница 20: ...1 4 7 10 2 5 8 11 3 6 9 ENGLISH ENGLISH 20 81...
Страница 27: ...3 Technical Data The technical data sheet can be found in the appendix of this manual ENGLISH ENGLISH 27 81...
Страница 46: ...7 Connect the water cooling system cable to the cooling alarm connection ENGLISH ENGLISH 46 81...
Страница 75: ...13 Appendix ENGLISH ENGLISH 75 81...
Страница 79: ......