5. Remove the machine from the crate and position it
in the desired location.
6. Remove the packing material.
7. The machine must be set up and installed by a
technician (see installation instructions R500).
5.8 Relocation of the machine
Steps:
1. Switch off the machine.
2. Disconnect the power cable.
3. Remove the exhaust system.
4. Reposition the machine (e.g. with auxiliary equipment if necessary) and place it on a level, clean floor.
5. Adjust the machine.
6. Initial commissioning of the electrical system.
7. Carry out function test.
ENGLISH
ENGLISH
40 / 81
Содержание R500
Страница 1: ...R500 Operation Manual 8057 Operation Manual 8057_4 0_EN 05 2023 ENGLISH...
Страница 20: ...1 4 7 10 2 5 8 11 3 6 9 ENGLISH ENGLISH 20 81...
Страница 27: ...3 Technical Data The technical data sheet can be found in the appendix of this manual ENGLISH ENGLISH 27 81...
Страница 46: ...7 Connect the water cooling system cable to the cooling alarm connection ENGLISH ENGLISH 46 81...
Страница 75: ...13 Appendix ENGLISH ENGLISH 75 81...
Страница 79: ......