55M4000EBE00 Rev C
66
i4000 Lattice Crane
Instruction Manual
Please perform regular inspections of:
•
The cables (verify they are not cut or damaged) and the connectors (verify the contacts are
not corroded).
•
The rope drum is securely fixed to the extremity of the boom.
•
The A2B switch piston to see that there is not too much corrosion.
•
The A2B switch piston to see that there is not too much corrosion.
•
Relay functionality for the lockout.
6.2 Periodic inspections (every six months)
-6-
Inspections and maintenance
•
When you switch on the system, check if all the alarm lights, audible alarms, and lockout
are working.
•
Make sure the system is correctly configured.
•
Check the accuracy of the clock.
•
Make sure the system has not detected any errors.
•
Check the weight on the hook (it should be the same as the last time you checked).
•
Check the radius according to the boom selection. The radius displayed should be between
0 and 10 % larger than the current radius of the crane.
•
Check that the A2B is functioning properly.
6.1 Frequent inspections
(Performed each time the crane is used)
Careful!
Before using the machine, you should identify any defects and
assess if they can have serious consequences.
Содержание i4000
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 12: ......
Страница 17: ...17 i4000 Lattice Crane Instruction Manual 55M4000EBE00 Rev C 1 6 Overall scheme ...
Страница 28: ......
Страница 30: ......
Страница 57: ......
Страница 71: ...71 i4000 Lattice Crane Instruction Manual 55M4000EBE00 Rev C Notes ...
Страница 72: ......