The appliance is floor mounted. The space in which the
appliance is to be fitted must have the following minimum
dimensions.
Between wall or unit and LH side of appliance - 4mm
top plate
Between wall or unit and RH side of appliance - 4mm
top plate
SHOULD THE WALL PROJECT BEYOND THE FRONT
OF THE APPLIANCE, IT MUST BE INCREASED TO
50mm (SEE FIG. 2). To allow oven door to open
enough to change oven and shelf positions.
Above the raised insulating cover handle - 60mm
In addition adequate clearance must be available at the
front of the appliance to enable it to be operated and
serviced.
The appliance is delivered in a fully assembled condition
with the exception of the following items which are
supplied separately packed and require assembly:-
The appliance rear distance bracket
The cooker handrail
The oil filter
Appliance rear distance bracket: If the rear wall is of
combustible material, there must be an air gap of 25mm
between the wall and the rear of the cooker. Fit the rear
distance bracket as shown in Fig. 7. Wherever possible it
is recommended that the skirting board is removed for the
width of the appliance to enable the rear edge of the
appliance to make contact with the vertical wall and avoid
a rear gap. (Combustible wall excepted).
Where the cooker is to stand in a recess or against a wall
which is to be tiled,
IN NO CIRCUMSTANCES SHOULD
THE TILES OVERLAP THE TOP PLATE.
The handrail brackets are held on the front edges of the
cooker top-plate casting. Fit the handrail brackets
ensuring the fibre protecting washers are in position.
Insert the handrail into the brackets, positioning them
correctly, and tighten the grub screws and locating bolts.
Installation requirements
17
CLEARANCES
PRELIMINARY INSTALLATION
Fig. 7
Fig. 8
DESN 515909
DESN 515617
BRACKETS SCREWED TO BACK
EDGE OF BOTH SIDE PLATES WHEN
COMBUSTIBLE WALL IS UNINSULATED
COMBUSTIBLE
WALL
LINE
25mm
Содержание 660
Страница 16: ...16 Site requirements Fig 6 680KCD C F 780KCD C F Rayburn 600 700 Wiring 111MB for independent Satronic boxes ...
Страница 19: ...Installation requirements 19 Fig 12 ALL BAFFLES MUST BE STACKED IN PLACE AS DIAGRAM ABOVE DESN 515919 ...
Страница 32: ...31 ...
Страница 33: ...33 ...
Страница 34: ...34 ...
Страница 35: ...35 ...