1.
Check that the hearth is level, then remove the
appliance from its transit wooden pallet, and position it
with its back against the wall and in its intended
position for flue connection.
2.
Locate and fit supplied flue pipe into socket of flue pipe
adaptor, as follows:-
a.
Take flue collar silicone rubber trim and bend into
a circle.
b.
Push trim into gap between flue pipe and flue
collar to create a neat seal.
c.
Flue collar trim can be found in oven pack.
3.
Fit trim seal, see Fig. 9.
4.
Connect and terminate the flue system in accordance
with the regulations in force.
SEE FIG. 10
1.
Remove top LH door
(Rayburn 680KCD C/F only)
and facia glass. Remove 2 fixing screws from control
panel chassis and hinge open.
2.
Remove lower bolt from control panel fixing bracket
and pivot bracket upwards, away from boiler access
door.
SEE FIG. 11
1.
Remove four securing nuts and withdraw access door
from below through burner aperture.
2.
Remove stack of 5 sheet metal baffles, check
assembly and replace as shown in Fig. 12.
3.
Check aluminium twisted baffles are in position and
there are 28 baffles, one in each recuperator tube.
NOTE:
LH set of x 4 aluminium baffles are half length.
4.
When replacing access door, tighten the 4 fixing
screws to a torque setting of 7.5 NM.
Installation requirements
18
SITE LOCATION
Fig. 10
Fig. 11
DESN 515949
DESN 515950
STEP 1
STEP 2
Fig. 9
DESN 515949
Содержание 660
Страница 16: ...16 Site requirements Fig 6 680KCD C F 780KCD C F Rayburn 600 700 Wiring 111MB for independent Satronic boxes ...
Страница 19: ...Installation requirements 19 Fig 12 ALL BAFFLES MUST BE STACKED IN PLACE AS DIAGRAM ABOVE DESN 515919 ...
Страница 32: ...31 ...
Страница 33: ...33 ...
Страница 34: ...34 ...
Страница 35: ...35 ...