C
HAPTER
3
8
Raven Switch Pro™ Installation & Reference Manual
MASTER SWITCH
The Switch Pro master switch toggles all section switches on or off. When the master switch is in the ON position,
each section will function according to the corresponding section switch (see below for details). Toggle the master
switch to OFF to turn off all boom sections manually.
NOTE:
If a remote master switch will be used with the Switch Pro, both master switches must be in the Off
position to turn off booms. Toggling either the Switch Pro master or the remote Master will enable
boom sections.
3-WAY SELECTABLE SECTION SWITCHES
Each of the 10 section switches can be toggled individually to one of three possible positions:
• ON - Manually control the section On. AccuBoom is disabled for this section and will not automatically turn this
section Off based on AccuBoom or coverage maps.
• ACCU - AccuBoom control over this section is enabled. AccuBoom will automatically control this section based
on AccuBoom and coverage maps. Refer to the Envizio Pro or Viper Pro Installation & Operation Manual for
more information on setting up and using AccuBoom features.
• OFF - Manually control the section Off. This section will remain Off regardless of AccuBoom and coverage
maps.
For sections not used by the Switch Pro, leave the corresponding section switch in the OFF position.
NOTE:
If auxiliary section switch hardware cannot be removed as described in the Preparation section on
page 1, the auxiliary section switches must be in the Off position to allow Switch Pro to control boom
functions properly.
USING ACCUBOOM OVERRIDE
Switch Pro provides simple operation of the AccuBoom feature on the Envizio Pro or Viper Pro field computer.
• AccuBoom control for each section is right at the operator’s finger tips.
• AccuBoom Override can be enabled for individual sections using the 3-way selectable section switches.
NOTE:
To override AccuBoom across all sections, use the AccuBoom override feature on the field computer.
Refer to the AccuBoom sections of the Envizio Pro or Viper Pro Installation & Operation Manual for
more information on using AccuBoom and the AccuBoom override feature.
Содержание Switch Pro
Страница 17: ...13 FIGURE 2 Viper Pro with Switch Pro for SCS 440 450 Cabled Systems...
Страница 19: ...15 FIGURE 4 Viper Pro with Switch Pro for SCS 4400 Cabled Systems...
Страница 21: ...17 FIGURE 6 Viper Pro with Switch Pro Combo Cable for SCS 440 450 Cabled Systems...
Страница 23: ...19 FIGURE 8 Viper Pro with Switch Pro Combo Cable for SCS 4400 Cabled Systems...
Страница 24: ...APPENDIX B 20 Raven Switch Pro Installation Reference Manual...
Страница 28: ...APPENDIX C 24 Raven Switch Pro Installation Reference Manual...
Страница 30: ...Index 22 Raven Switch Pro Installation Reference Manual...