016-0171-566 Rev. C
31
SmartYield™ Pro Control Node Installation
SmartYield Pro Node Harness Connections
Review the following sections to connect the SmartYield Pro node harness to the node and sensors:
SmartYield Pro Node Harness Connections
1.
Insert the large, rectangular connectors on the SmartYield Pro node harness to the SmartYield Pro node.
The connectors should not require excessive force to insert.
Note:
Do not force the connector into the node. The connectors are keyed to ensure the connectors are
installed properly and should insert with very little force required.
2.
Tighten the 1/4” bolt to secure the node connector to the node.
3.
Route the moisture sensor cable connector to the node harness plug labeled “Moisture Sensor.” Secure
any excess cable length using the cable ties provided. Review the
section on page 29 for additional cable routing information.
4.
Route the yield sensor cable connector to the node harness plug labeled “Yield Sensor.” Secure any excess
cable length using the cable ties provided.
5.
Route the header height sensor cable to the node harness plug labeled “Header Height.”
CAN and Power Connections
Refer to Chapter 7,
Envizio Pro™ Series Connection
, for assistance with the “CAN” and “Switched Power”
connections on the SmartYield Pro node harness connectors.
Содержание SmartYield Pro
Страница 1: ...SmartYield Pro Installation Manual P N 016 0171 566 Rev C 12 15 E26333 Copyright 2015 ...
Страница 14: ...Chapter 2 10 SmartYield Pro Installation Manual ...
Страница 24: ...Chapter 3 20 SmartYield Pro Installation Manual ...
Страница 35: ...Chapter 5 30 SmartYield Pro Installation Manual ...
Страница 39: ...Chapter 6 32 SmartYield Pro Installation Manual ...
Страница 43: ...Index 36 SmartYield Pro Installation Manual ...