12
LIQUID AND
GRANULAR
APPLICA
TIONS
CONSOLE CALIBRATION
1.
CALCULATING "BOOM CAL"
(LIQUID APPLICATIONS)
1)
Broadcast Spraying
Calculate the width of each boom in inches [cm] by multiplying the number of tips times the spacing.
Write these boom widths down for future reference when programming the Console.
FIGURE 4
2)
Band Spraying
Calculate the width of each boom in inches [cm] by multiplying the number of tips by the spacing.
Calculate the Adjusted Applied Rate by multiplying the Broadcast Rate by Band Width in inches [cm]
divided by Spacing in inches [cm].
EXAMPLE:
Broadcast Rate
= 20 GPA [200 lit/ha]
Spacing
= 40 inches [100 cm]
Band Width
= 14 inches [40 cm]
Adjusted Applied Rate= GPA x Band Width
Spacing
= 20 x 14 = 7 GPA
40
= [200] x [40] = [80 lit/ha]
[100]
Содержание SCS 4600
Страница 1: ...Operators Manual SCS 4600 SCS 4600 SCS 4600 SCS 4600 SCS 4600...
Страница 10: ...5 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 11: ...6 SECTION 1 LIQUID AND GRANULAR APPLICATIONS LIQUID AND GRANULAR APPLICATIONS...
Страница 15: ...10 FIGURE 3 BATTERY CONNECTIONS LIQUID AND GRANULAR APPLICATIONS...
Страница 34: ...29 FIGURE 6...
Страница 37: ...32 GRANULAR APPLICATIONS SECTION 2 GRANULAR APPLICATIONS...
Страница 38: ...33 FIGURE 7...
Страница 44: ...39 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 45: ...40 CAN APPLICATIONS SECTION 3 CONTROLLER AREA NETWORK CAN...
Страница 47: ...42 CAN APPLICATIONS FIGURE 13 FIGURE 14...
Страница 48: ...43 FIGURE 15...
Страница 49: ...44 CAN APPLICATIONS FIGURE 17 FIGURE 16...