8
2.
MOUNTING THE CONTROL VALVE
(LIQUID APPLICATIONS)
1)
Mount the motorized Control Valve in the main hose line between the Flow Meter and the booms,
with motor in the upright position. (For flow less than 3 GPM [11 lit/min], the motorized Control Valve
is mounted in a by-pass line. Refer to Appendix 2 for alternate plumbing diagram).
2)
Connect the Product Cable connectors to boom valves, Flow Meter, and motorized Control Valve
(Reference Figure 1). NOTE: Black wire to boom valve #1, Brown wire to boom valve #2, Blue wire
to boom valve #3, Black/White wire to boom valve #4, Brown/White wire to boom valve #5, Blue/Wht
wire to boom valve #6, White/Black wire to boom valve #7, White/Brown wire to boom valve #8,
White/Blue wire to boom valve #9 and Pink wire to boom valve #10.
LIQUID AND
GRANULAR
APPLICA
TIONS
Содержание SCS 4600
Страница 1: ...Operators Manual SCS 4600 SCS 4600 SCS 4600 SCS 4600 SCS 4600...
Страница 10: ...5 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 11: ...6 SECTION 1 LIQUID AND GRANULAR APPLICATIONS LIQUID AND GRANULAR APPLICATIONS...
Страница 15: ...10 FIGURE 3 BATTERY CONNECTIONS LIQUID AND GRANULAR APPLICATIONS...
Страница 34: ...29 FIGURE 6...
Страница 37: ...32 GRANULAR APPLICATIONS SECTION 2 GRANULAR APPLICATIONS...
Страница 38: ...33 FIGURE 7...
Страница 44: ...39 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 45: ...40 CAN APPLICATIONS SECTION 3 CONTROLLER AREA NETWORK CAN...
Страница 47: ...42 CAN APPLICATIONS FIGURE 13 FIGURE 14...
Страница 48: ...43 FIGURE 15...
Страница 49: ...44 CAN APPLICATIONS FIGURE 17 FIGURE 16...