Installation: Tip Protector Bracket
45
INSTALLATION
TIP PROTECTOR BRACKET
NOTE:
Tip protector brackets (P/N 107-0172-759, 107-0172-760, and 107-0172-761)are not used on 135’ and
132’ boom configurations.
1. Locate the foam marker bracket or a standard tip protector shield bracket at the outer end of each boom tip.
FIGURE 41. Standard Tip Protector Shield Bracket with Boom Recirculation Installed
2. Remove the existing machine hardware. Set it aside as it will be reused to mount the tip protector bracket.
3. Utilize the existing machine hardware to mount the left and right tip protector brackets to the boom structure.
The racket will be replaced in the same location as the standard bracket.
NOTE:
For 90’ and 100’ booms, use the tip protector shield brackets (P/N 107-0172-759 and 107-0172-760).
For 120’ booms, the tip protector shield tube mount bracket (P/N 107-0172-761) is also needed. Use
the provided M8 hardware to fasten the mount bracket to the protector shield.
SYSTEM DRAWINGS
System drawings begin on the next page.
Remove Existing
Hardware
Содержание Case IH 3050 Series
Страница 14: ...CHAPTER 2 10 Boom Recirculation Installation and Operation Manual for Case IH 50 Series Patriot Sprayers ...
Страница 31: ...Installation Boom Plumbing 27 INSTALLATION FIGURE 17 Inner Boom Plumbing Example for 7 Section 120 Boom ...
Страница 33: ...Installation Boom Plumbing 29 INSTALLATION FIGURE 19 Mid Boom Plumbing Example for 7 Section 120 Boom ...
Страница 54: ...CHAPTER 3 50 Boom Recirculation Installation and Operation Manual for Case IH 50 Series Patriot Sprayers ...
Страница 58: ...CHAPTER 4 54 Boom Recirculation Installation and Operation Manual for Case IH 50 Series Patriot Sprayers ...
Страница 60: ......