CHAPTER 3
24
Boom Recirculation Installation and Operation Manual for Case IH 50 Series Patriot Sprayers
BOOM PLUMBING FOR 6-SECTION (90’ AND 100’)
FIGURE 14. Inner Boom Plumbing for 6-Section (90’ and 100’) Boom Configurations
Existing Machine
Pa
rts
Se
ctio
n V
alv
e
3 &
4
To
C
en
te
r
Se
ctio
n V
alv
e
2 & 5
Fr
om S
ection 1 & 6
Fol
d 1
Fo
ld
2
2 & 5
2 & 5
3 & 4
Содержание Case IH 3050 Series
Страница 14: ...CHAPTER 2 10 Boom Recirculation Installation and Operation Manual for Case IH 50 Series Patriot Sprayers ...
Страница 31: ...Installation Boom Plumbing 27 INSTALLATION FIGURE 17 Inner Boom Plumbing Example for 7 Section 120 Boom ...
Страница 33: ...Installation Boom Plumbing 29 INSTALLATION FIGURE 19 Mid Boom Plumbing Example for 7 Section 120 Boom ...
Страница 54: ...CHAPTER 3 50 Boom Recirculation Installation and Operation Manual for Case IH 50 Series Patriot Sprayers ...
Страница 58: ...CHAPTER 4 54 Boom Recirculation Installation and Operation Manual for Case IH 50 Series Patriot Sprayers ...
Страница 60: ......