Installation: Boom Plumbing
41
INSTALLATION
1. Disassemble the boom tube section that sticks out in the front of the boom truss.
2. Dismount the bracket holding the tube section.
3. Remount the tube bracket to the truss rib where the boom spot light is mounted.
NOTE:
The boom spot may have to be moved to the other mounting holes on the rib.
4. Reuse the boom tube clamp to mount the M100 coupling to the bracket.
5. Use hose to connect the boom tube to the mounted coupling and CR-BEFV.
6. Install a turret or side take-off nozzle body to the CR-BEFV to mount the NCV.
FIGURE 35. Outer Boom Fold 2 Example for 7-Section (135’) Boom
Содержание Case IH 3050 Series
Страница 14: ...CHAPTER 2 10 Boom Recirculation Installation and Operation Manual for Case IH 50 Series Patriot Sprayers ...
Страница 31: ...Installation Boom Plumbing 27 INSTALLATION FIGURE 17 Inner Boom Plumbing Example for 7 Section 120 Boom ...
Страница 33: ...Installation Boom Plumbing 29 INSTALLATION FIGURE 19 Mid Boom Plumbing Example for 7 Section 120 Boom ...
Страница 54: ...CHAPTER 3 50 Boom Recirculation Installation and Operation Manual for Case IH 50 Series Patriot Sprayers ...
Страница 58: ...CHAPTER 4 54 Boom Recirculation Installation and Operation Manual for Case IH 50 Series Patriot Sprayers ...
Страница 60: ......