Ravelli Sara Скачать руководство пользователя страница 34

Each 55 Built-in-Heater Flue Kit 
(non-Chimney installation) contains:-

y

t

i

t

n

a

u

Q

n

o

i

t

p

i

r

c

s

e

D

o

N

 

t

r

a

P

1

Galvanised outer liner
ø100mm x 900mm long

4

2

Stainless steel inner liner
ø75mm x 900mm long

4

5

Inner/outer flue liner spacer

2

8

Rain cap 75mm

1

9

Rain cap 100mm

1

This flue kit may be used in new or existing timber

chimneys.  The overall  height  of  the  flue  is  3.6m.

Kit is supplied in a carton. 

Heat-resistant

floor protector

Seismic restraint

(to be fitted)

600mm from

roof

penetration

Ravelli Sara & Camino 

- new home

(non-Chimney installation)

55

25mm minimum clearance if lined:

75mm minimum clearance if unlined

Note: The Davin 55 Built-in-Heater Flue Kit 
for Sara and Camino (non-Chimney) complies 
with AS/NZS2918:2001 as per Applied 
Research Test Report 05/1185, dated 15 
September 2005.
All fires must be installed by a qualified 
installer as per the manufacturer’s instruc-
tions and AS/NZS2918:2001.

6c     Ceiling thimble ø107mm hole         1          

702 Support angle 950mm long

– 40mm x 40mm sides

2

46 

Velocity cone

1

Each 55:1 Built-in-Heater Flue Kit 
(Chimney installation) contains:-

y

t

i

t

n

a

u

Q

n

o

i

t

p

i

r

c

s

e

D

o

N

 

t

r

a

P

Galvanised outer liner
ø100mm x 900mm long

4

Stainless steel inner liner
ø75mm x 900mm long

4

5

Inner/outer flue liner spacer

2

8

Rain cap 75mm

1

9

Rain cap 100mm

1

11 

Telescopic offset 100mm 
(Galvanised) - (2 x 45° bends)

10 

Telescopic offset 75mm 
(Stainless) - (2 x 45° bends)

Ravelli Sara & Camino 

- new home

(Chimney installation)

55:1

This flue kit may be used in new or existing timber 

chimneys.  The overall  height  of  the  flue  is  3.6m. 

Kit is supplied in a carton. 

Note: The Davin 55:1 Built-in-Heater Flue Kit 
for Sara and Camino (chimney) complies 
with AS/NZS 2918:2001 as per Applied 
Research Test Report 05/1185, dated 15 
September 2005. 
All fires must be installed by a qualified 
installer as per the manufacturer’s 
instructions and AS/NZS2918:2001.

Heat-resistant

floor protector

Chimney to

be flashed

by builder

25mm minimum clearance if lined:

75mm minimum clearance if unlined

Seismic restraint

(to be fitted)

1

1

6         C

   eiling Thimble    1 07mm h

  ole  

1

ø

702 Support angle 950mm long

– 40mm x 40mm sides

2

46 

Velocity cone

1

1

2

Each 56 Insert Flue Kit contains:-

y

t

i

t

n

a

u

Q

n

o

i

t

p

i

r

c

s

e

D

o

N

 

t

r

a

P

2

Stainless steel inner liner
ø75mm x 900mm long

5

8

Rain cap 75mm

1

19

Flexible flue pipe – stainless
steel ø75mm x 1m

1

839

Casing cover – standard 
ø75mm - ø300mm

1

This flue kit may be used in replacement applications

in masonry chimneys. The overall height of the flue is

6.0m. Kit is supplied in two cartons. 

Note: The Davin 56 Insert Flue Kit for Ravelli

Applied Research Test Report 05/1185,
dated 15 September 2005. 
All fires must be installed by a qualified
installer as per the manufacturer’s
instructions and AS/NZS2918:2001.

Heat-resistant

floor protector

(to be fitted)

56

Ravelli Sara Insert Flue Kit

Sara complies with AS/NZS 2918:2001 as per

Seismic restraint

Stainless steel inner
ø75mm x  0mm long

4

50

1

2

16

Clamp – flexible flue to
stainless flue pipe

46 

Velocity cone

1

74

32

Page 10

16. Flueing

Содержание Sara

Страница 1: ...nstallation Manual PLEASE READ THIS ENTIRE MANUAL BEFORE INSTALLATION AND USE OF THIS WOOD PELLET FIRE FAILURE TO FOLLOW THESE INSTRUCTIONS COULD RESULT IN PROPERTY DAMAGE BODILY INJURY OR EVEN DEATH...

Страница 2: ...requires technical programming and individualised air pressure adjustments to ensure it will operate safely and ef ciently and to avoid possible damage to the re or the home Installation of the Sara W...

Страница 3: ...re 8 Menu Descriptions 8 Menu One Setting the Clock 8 Menu Two Set Crono Programmable Thermostat 9 Menu Three Select Language Setting the Language 10 Menu Four View Settings 10 Menu Five Stove State...

Страница 4: ...uel and operation of your stove will directly determine how frequently you will need to clean out the re pot The use of high ash fuels may result in the stove needing to be cleaned daily whereas Pleas...

Страница 5: ...nd after each lighting You must check that the Burn Pot Liner where the combustion takes place is clean and that no waste or residue blocks the holes in order to always guarantee excellent combustion...

Страница 6: ...loading screw 1 Ignition is by means of the resistance 2 which overheats the air from the special intake 5 which on contact with the pellets will allow the development of the ame At this point the exh...

Страница 7: ...e not compliant with the safety instructions Installation that is not compliant with the regulations in force in the country Installation by personnel who are not quali ed or authorized Modi cations a...

Страница 8: ...TING Button 5 on your remote control ROOM TEMPERATURE SETTING see 6 3 1 Modi cations of the room temperature setting on page 9 5 2 Filling the Pellet Hopper Check hopper for foreign objects then empty...

Страница 9: ...ent houses may work better on other settings 6 Switch the power to the re back on the re must be pushed back into its cradle when this is done 7 Press the red button quickly after tuning the power on...

Страница 10: ...01 Monday 02 Tuesday 03 Wednesday 04 Thursday 05 Friday 06 Saturday 07 Sunday OFF Deactivated 5 6 Operating Instructions The heater is completely automated and will self regulate the ignition phase ve...

Страница 11: ...through 10 to set program 2 if required 12 Once you have completed setting up program 2 Press 3 to exit Possible Settings 6 3 1 Modi cations of the room temperature setting The hand held remote that...

Страница 12: ...unit This menu is used when a Service Technician has to understand the parameters set in the machine to nd any modi cations to improve the functioning of the stove 6 6 Menu Five Stove State Fire Statu...

Страница 13: ...d T ON The room sensor is off or an external thermostat has been connected COOLING WAITING FOR START The stove is cooling DOWN When stove has cooled down it will start automatically ON WAITING FOR RES...

Страница 14: ...tricity supply to smoke extractor Contact local Service Technician The smoke extractor is blocked Contact local Service Technician DEPRESSION ALARM The combustion chamber is dirty Follow the cleaning...

Страница 15: ...esh Air Intake Owner Technician Blower Mechanisms Technician Fire exhaust passages Technician Flue system Technician Frequency recommendations given are based on typical re performance and maybe short...

Страница 16: ...of doing this is to vacuum it out Make sure the air intake is clear of ash or debris this can also be vacuumed out to ensure it is clean Place the burn pot back into the re making sure that the burn p...

Страница 17: ...ish patina will form after a few hours A poorly performing re will get brown or black deposits on the glass The glass must be cleaned only when the re is cold using a damp cloth or kitchen paper Somet...

Страница 18: ...rical protection It is very important that the re be thoroughly cleaned and serviced as stated above Exposed metal part may be painted with high temperate paint to prevent rusting over the off season...

Страница 19: ...17 Page 16 9 Maintenance Record E R U T A N G I S T U O D E I R R A C K R O W E T A D...

Страница 20: ...apply if you are seeking warranty service from a dealer other than the dealer from whom you originally purchased the product Check with your dealer in advance for any costs to you when arranging a war...

Страница 21: ...let Solution e r i F s approved venting components hearth components or other accessories used in conjunction with the appliance Any part of a pre existing replace system Pellet Ravell i t u l o S i o...

Страница 22: ...re purchase and attach the receipt and any other documents business cards from the retailer that sold you the re Name of Store where Pellet re was purchased e s a h c r u P f o e t a D d i a P t n u...

Страница 23: ...ample of Cavity Design Section View 28 Example of Cavity Design Top View 29 Adjusting the Support Frame 30 Seismic Restraint 30 Fixing to Concrete Floor 30 Fixing to Timber Flooring only 30 Fixing to...

Страница 24: ...al air intake may be required see 5 Creating the Cavity on page 26 for cavity ventilation requirements 6 There must be suf cient circulation of air in the room where the pellet re is installed Never o...

Страница 25: ...i F s n o i t u l o S declines all responsibility 1 The re must be installed on a oor with suf cient carrying capacity If the existing building does not meet this requirement appropriate measures mus...

Страница 26: ...AS NZS 4014 6 standard are recommended Dirty fuel will adversely affect the operation and performance of the unit and will void the warranty The Pellet Fuel Industries PFI has established standards f...

Страница 27: ...t quali ed or authorised Modi cations and repairs that are not authorized by the manufacturer Use of spare parts that are not original Exceptional events If you require further information please cont...

Страница 28: ...est 05 1185 If installing a oating hearth ensure suf cient clearance is left below the re to allow for installation of the chosen surround Exterior of Cavity D E J H VENT F B C A G I J VENT Interior o...

Страница 29: ...0mm min Includes 100mm clearance from rear of ue spigot box s w o l l a r o f a m m 0 0 1 l l a w s s e n k c i h t d n a If this measurement is less than 500mm a custom surround will be required Ens...

Страница 30: ...ith all minimum distance to all combustible surfaces Any modi cations to the dimensions shown to be veri ed by consultation with the relevant Building Consent Authority 4 Ensure there is a minimum of...

Страница 31: ...nclosure 3 Comply with all minimum distance to all combustible surfaces Any modi cations to the dimensions shown to be veri ed by consultation with the relevant Building Consent Authority 4 Ensure the...

Страница 32: ...0 X 90 coach screws Thickness of ooring must be 20mm minimum The ooring shall be xed to the nearest joist with two 8g x 40 screws per hold down anchor 12 Fixing to Timber Floor Framing Minimum 14g x 6...

Страница 33: ...ons and clearance requirements of their electrical appliances to ensure the appliance is suitably located in relation to the wood pellet re t e l l e P e r i F s n o i t u l o S and Ravelli does not g...

Страница 34: ...a Camino new home Chimney installation 55 1 This flue kit may be used in new or existing timber chimneys The overall height of the flue is 3 6m Kit is supplied in a carton Note The Davin 55 1 Built in...

Страница 35: ...by a quali ed technician All operations assume the re is in the default OFF mode press button 3 to achieve this Some operations can also be performed in nal cleaning use caution if the re has been ru...

Страница 36: ...will appear 4 Press 1 or 2 to change to your desired language 5 Press 3 twice to return to the main screen 17 3 3 Menu Four View Settings In this menu you can check the values of the parameters set i...

Страница 37: ...r located on the right hand side of the stove Sometimes due to interference from other electrical household appliances microwave ovens satellite decoders mobile phones the connection between the stove...

Страница 38: ...1 8 Screw power 1 PR06 Sec 2 0 Screw power 2 PR07 Sec 5 2 Screw power 3 PR08 Sec 3 0 Screw power 4 PR09 Sec 3 5 Screw power 5 PR10 Sec Re start threshold PR11 C 80 No pellet threshold PR12 C 50 Off t...

Страница 39: ...Comfort climate PR42 on off OFF Fan 2 speed 1 PR43 V Fan 2 speed 2 PR44 V 140 Fan 2 speed 3 PR45 V 160 Fan 2 speed 4 PR46 V 180 Fan 2 speed 5 PR47 V 210 Draft setting PR48 on off OFF or for version Ai...

Страница 40: ...reen Yellow Green Yellow Green 7 8 11 12 9 10 3 4 Brown Brown Yellow Green Brown 10 9 Brown Blue Yellow Green Black Blue Blue Brown 1 6 6 5 5 6A 5A 1 2 2 6 Encoder Red Black White Black Brown White 7...

Страница 41: ...eration of my Pellet Fire I understand that warranty conditions require an authorised Pellet Fire Solutions Installer to complete the installation Signed Date Installation Details Pellet Fire Model Se...

Отзывы: