Connections
! IMPORTANT
The connections must be set up by a technician that is qualified and/or authorised by the
Manufacturer.
Electrical connection
The insert is equipped with a three-pole cable (Fig.2), for a correct installation it is necessary to provide the dedicated electrical
connection under magneto-thermic (Fig.1) of adequate size according to the absorption of the generator in order to guarantee the
maximum safety of the installation.
Testing and commissioning
Stove start-up must be preceded by testing, which includes an operational check of the following elements:
•
connection to the smoke evacuation system;
•
checking that all materials used to build the smoke duct, chimney and chimney pot are regulation and suitable for use.
The testing is positive only when all operational phases have been completed without any anomaly being detected.