30
0495-M002-0
3100 min
(excavation)
2863
(S1150A5)
800 min
(excavation)
603
(S1150A5)
800
mi
n
(excavat
ion)
3100 min
(excavation)
2
500
(S
1
1
50
A
5
)
2
600
m
in
(excavati
o
n)
2
500
(S
1
1
50
A
5
)
2
596
m
in
(excavati
o
n)
26
0
60
0
linea galleggiamento in acqua
waterline in water
linea galleggiamento in cemento liquido
waterline in liquid cement
space to fill (*)
space to fill (*)
23
0
Ø60
m
in
hydraulic power unit
space to fill (*)
ground
ground
ground
tube
300
==
150
Fig. 5
Fig. 6
Fig. 4
D
E
F
Livello pavimento fi nito
Finished fl oor surface
230mm
A
6
Содержание RAV1140
Страница 16: ...16 0495 M002 0 3 RAV1110LK 2019 2496 98min 155max with spacer 2340 180 3064 603 1070 500 1070 500 2720 1450 500...
Страница 20: ...20 0495 M002 0 A 3...
Страница 24: ...24 0495 M002 0 P1 P2 400V50Hz3Ph 0 1 IG A B C 4...
Страница 34: ...34 0495 M002 0 2160 2340 A A Fig 10 Fig 11 Fig 12 M M M N E F E B 6...
Страница 36: ...36 0495 M002 0 Fig 16 Fig 17 6 F H L I G G Fig 13 Fig 15 Fig 14...
Страница 38: ...38 0495 M002 0 B D E F H G Fig 19 Fig 18 6 A C F G...
Страница 42: ...42 0495 M002 0 C Fig 22 Fig 23 6...
Страница 50: ...50 0495 M002 0 P1 P2 400V50Hz3Ph 0 1 IG A Fig 26 7...