Operating the AXMAT system
4
22
Run the spreading test with the openings set as calculated for the job:
See
4.2: AXMAT calibration, page 24
Pour the contents of the collecting vessels into the measuring tubes from the
left-hand side. The quality of the horizontal spreading pattern can now be
simply read off the 5 inspection glasses.
4.1.5
Performing a spreading test at a working width of 36 m or greater
Place all 9 collecting vessels evenly spaced as shown in the sketch. Place
1 collecting vessel each in the middle of the tramline, in the overlapping zone
and centrally between these positions.
Figure 4.6:
Cross-distribution
Adjust the attachment height of the spreader on the left and right hand sides
according to the information in the fertiliser chart. Note that the attachment
height relates to the upper edge of the collecting vessels.
Check the spreading elements (spreading discs, spreader vanes, outlet) for
correct functioning and completeness.
NOTICE
If the quantity collected in the collecting vessels is insufficient, repeat the
passage.
Do not change the adjustment of the metering slides.
1/2x
1/2x
x
1/4x
1/4x
1
5
9
Содержание AXMAT DUO
Страница 8: ...User instructions 1 4 ...
Страница 40: ...Alarm messages and possible causes 5 36 ...
Страница 42: ...Index B ...
Страница 44: ......