29
10 Initial start-up
Self test
When first commissioning a new device, start a
one-time self-test. This test serves to adjust the
device to its specific ambient conditions.
It runs automatically, and takes 45 minutes; if an
UltraVent is in use, the test will take around 20
minutes longer.
> To perform the self-test, check the hook lad-
ders and the air baffle to ensure they are sea-
ted correctly.
>
The device must be connected to water,
wastewater, and electricity as per installation
instructions; gas devices must also be con-
nected to gas supply and exhaust lines.
>
The left side panel must be closed.
>
Insert a flat GN container into the middle of
the hook ladders, with the opening facing the
bottom.
> Do not open the cooking chamber door duri-
ng the self-test.
Содержание SelfCookingCenter XS UV
Страница 1: ...SelfCookingCenter XS UV and UV Plus CombiMaster Plus XS UV and UV Plus Original Installation Manual...
Страница 26: ...26 8 Wastewater connection 250 300 mm 10 12 max 1 m 3 ft 40 mm 1 min 3 5 min 3 5 40 mm 1...
Страница 30: ...30 10 Initial start up SCC CMP...
Страница 33: ...33 11 Maintenance Change HEPA filter...
Страница 39: ...39 15 Declaration of conformity 15Declaration of conformity...
Страница 40: ...80 02 467 V 13 2 04 2018 RTS Dja en...