V08 en, SCC
- 84 -
Function test
1
Switch unit ON
2
On operator PCB set DIP switch 2 to „ON“ position
3
Select function test with timer dial:
Activation of manual calibration
Function test
bini - ball valve initialization, to start press core probe key.
4
Activate function test by pressing core temperature key
5
Select desired step with timer dial.
6
Activate selected step with timer key.
7
Activate component with core temperature key.
8
To de-activate function test set DIP switch 2 to „OFF“ position.
Switch unit off and on again.
CM_P - Function test - F
Function
Connection
PCB
Cabinet
display
Time
display
Comment
Steam 50%,
Electric unit
X24:(1-2)
actual temp.B5
steam generator
1 / 0
Gas:
no function
Steam 100%
Electric unit
X24:(1-2)+(5-
6)
actual temp.B5
steam generator
1 / 0
Gas:
no function
Hot air 50%
Electric unit
X24:(7-8)
actual temp.B1
cabinet
1 / 0
Gas:
no function
Hot air 100%
Electric unit
X24:(7-8)+(3-
4)
actual temp.B1
cabinet
1 / 0
Gas:
no function
Steam Gas unit
BUS
actual temp.B5
B5 steam generator 1 / 0
Electric:
no function
Hot air Gas unit
table / floor top
BUS
actual temp.B1
cabinet
1 / 0
Electric:
no function
Hot air Gas
floor unit bottom
BUS
actual temp.B1
cabinet
1 / 0
Electric:
no function
Motor top MAX rpm
Table and floor models
BUS
Set rpm
Act. rpm
clockwise
Motor top MAX rpm
Table and floor models
BUS
Set rpm
Act. rpm
anti clockwise
Motor top MIN rpm
Table and floor models
BUS
Set rpm
Act. rpm
clockwise
Motor top MIN rpm
Table and floor models
BUS
Set rpm
Act. rpm
anti clockwise
Motor bottom MAX rpm
floor models only
BUS
Set rpm
Act. rpm
clockwise
201 / 202 only
Motor bottom MAX rpm
floor models only
BUS
Set rpm
Act. rpm
anti clockwise
201 / 202 only
Содержание SelfCookingCenter SCC
Страница 1: ...V08 en SCC CMP 09 2018 Training Manual SelfCookingCenter SCC SCC_XS CombiMaster Plus CMP CM V08...
Страница 3: ...3 V08 en SCC...
Страница 10: ...V08 en SCC 10 Index E Index G Index H I Index I SCC XS...
Страница 25: ...25 V08 en SCC...
Страница 64: ...V08 en SCC 64 SCC Service level pwd TECLEVEL Process is active...
Страница 74: ...V08 en SCC 74...