11 | Options
62 / 72
80.06.231_iVarioProL-iVarioProXL_IM_en-GB
Levelling plinth installation
The unit can be set up on height-adjustable feet on plinths.
CAUTION
Risk of crushing when installing due to the weight of the unit
Fingers, hands and feet can be crushed and if the centre of mass is not
observed, the unit may tip over during lifting and transport.
n
Wear appropriate protective clothing when positioning the unit.
n
Only lift the unit at the intended lifting points.
n
Use carrying aids, e.g. a carrying strap.
n
Ensure an even weight distribution of the unit.
n
Note the centre of mass of the unit.
Setting up the unit with height-adjustable feet for levelling
a
For units with storage space, this must first be removed. Only mount the
storage space again once the levelling is complete.
1. Unscrew all screws on the inside of the substructure and remove the cover
of the substructure on each side.
2. Raise the unit.
3. Remove the plastic feet.
Содержание iVario Pro L
Страница 1: ...iVario Pro L iVario Pro XL Original installation manual...
Страница 70: ......
Страница 71: ......