Hardware Installation
User Manual
ApplianceStor
50
Rev. 1, November 2011
15
Hardware Preparation and Installation
Installing friction rail kit items
Your friction rail kit package contains:
•
Two pairs of rack rails (for the rack)
•
Nut-and-bolt type screws and one pair of server latches
Figure 7- Rail Kit
Attaching the fixing latches to the server
Refer to the image below for the locations to attach the two fixing latches to the two sides of the server with four
screws.
Figure 8-Rail Latches
Attaching the rack rails
To attach the rack rails
1.
Place the two front rail rack joints into the rear rail rack slots, as shown in the following figure.
2.
Attach the front and rear rail racks with eight screws and nuts, as shown in the following figure. Do not
secure the screws too tight so that you can still adjust the length of the rack rails to meet the depth of the
server rack.
Figure 9- Rail assembly
Содержание ApplianceStor 50
Страница 1: ...Manual contents ApplianceStor50 Performance Storage Server User Manual 1th Edition November 2010 ...
Страница 29: ...Introduction User Manual ApplianceStor 50 Rev 1 November 2011 11 LAN RJ 45 LEDs Figure 6 NIC LEDs ...
Страница 30: ...Packing Checklist Chapter 2 Before You Begin ...
Страница 61: ...Hardware Installation User Manual ApplianceStor 50 Rev 1 November 2011 43 Figure 56 Finish chipset install ...
Страница 65: ...Hardware Installation User Manual ApplianceStor 50 Rev 1 November 2011 47 Figure 62 Install finish ...
Страница 71: ...Mother board Jumpers Connectors LEDs BIOS Chapter 5 Advanced System Use and Maintenance ...
Страница 80: ...Advanced System Use Maintenance User Manual ApplianceStor 50 Rev 1 November 2011 62 ...