
Operating concepts
R&S
®
NRPxxP
24
User Manual 1179.5760.02 ─ 02
nect the power sensor as described in
Chapter 3.4, "Connecting to a DUT"
on page 12.
Connect the power sensor to the signal source.
2. Connect the power sensor to the computer as shown in
.
For a detailed description, refer to
Chapter 3.7.1.1, "Simple USB connection"
Starting a measurement
For a detailed description of how to measure in this setup, refer to the operating man-
ual of the R&S
NRPV.
1. Start the R&S
NRPV.
2. Execute zeroing.
Note:
Turn off all measurement signals before zeroing. An active measurement
signal during zeroing causes an error.
3. Switch on the test signal of the signal source.
4. Start a measurement.
5.4
R&S
Power Viewer
The R&S
Power Viewer is software that simplifies many measurement tasks. It is provi-
ded on your documentation CD-ROM and on the Rohde & Schwarz website as a sepa-
rate standalone installation package.
Required equipment
●
R&S NRPxxP power sensor
●
R&S
NRP
‑
ZKU cable or an R&S
NRP
‑
Z5 sensor hub and an R&S
NRP
‑
ZK6 cable
to connect the power sensor to the computer
●
Computer with installed:
–
R&S
NRP Toolkit version
4.20 or higher
–
R&S
Power Viewer version 9.2 or higher (refer to the operating manual of the
R&S
Power Viewer for a description of the installation process)
R&S
Power Viewer