Copyright 2020, Al-Rakeb Oil, Electricity & Construction Services Company | Kuwait
36
4 are located in the dispenser section, 2 on every dispenser. The sixth is located in control
cabin where the electrical box is located.
Figure 31. The switch in the electrical box.
5.
Lights can be turned on by turning the switch located in the rear cabin and the control
room. Please refer to section 1.3 part number 9 to locate all light switches.
6.
Make sure to electrically ground the MFS using the ground reel located in the rear cabin
where the infeed is. This can be done by connecting the reel to the ground the other truck.
The reel ground location figure is mentioned previously in section 1.3.
7.
There are four power distribution units with four circuit breakers for each unit located in
the control room. The location figure of the power distribution unit is mentioned in section
1.3.
8.
There is an air conditioning unit located in the control room to ensure the comfort of the
operator. The AC remote control is located behind the door of the control room. It can be
used to control the temperatures inside the room. The location figure of the AC unit and
the remote is mentioned in section 1.3.
Содержание Mobile Filling Station
Страница 12: ...Copyright 2020 Al Rakeb Oil Electricity Construction Services Company Kuwait 12 Figure 8 Control room entrance...
Страница 13: ...Copyright 2020 Al Rakeb Oil Electricity Construction Services Company Kuwait 13 Figure 9 Shows the control room...
Страница 43: ...Copyright 2020 Al Rakeb Oil Electricity Construction Services Company Kuwait 43 4 5 6 7...
Страница 63: ...Copyright 2020 Al Rakeb Oil Electricity Construction Services Company Kuwait 63...
Страница 64: ...Copyright 2020 Al Rakeb Oil Electricity Construction Services Company Kuwait 64...
Страница 66: ...Copyright 2020 Al Rakeb Oil Electricity Construction Services Company Kuwait 66...
Страница 68: ...Copyright 2020 Al Rakeb Oil Electricity Construction Services Company Kuwait 68...