3. OPERATION AND SETUP INSTRUCTIONS
3.1 Introduction
This section of the user’s manual describes the appropriate and safest way to operate the MFS. All
sorts of sections are listed below and shall be explained in detail. Please follow the “Operation and
Setup Instructions” section since it is mentioned in the “Safety” section to follow these instructions
to ensure safe operation.
3.2 Transportation and Logistics
To ensure safe transportation and logistics the MFS can only fit a six-wheel truck that can fit the
dimensions of the HC 40 ft ISO standard container. Dimensions are stated in section 2.5
“Dimensions Overview” tittle 2.5.1 “MFS dimensions”. Using these dimensions, the operator or
the truck driver can decide on how to transport the MFS unit. Transportation shall only be done
while the tank is empty. Please refer to table 7 for the MFS unit weight. Transportation shall only
be done when the tank is empty. Make sure that the handrail and ladder is removed whenever the
station is being transported.
3.3 Lifting of the Tank
Please refer to section 1.5.1 “Safe Lifting” for safe lifting instructions. Note that lifting can only
be done while the tank is empty. Thus, having a net weight of the MFS to be 25 tons. Please refer
to table 7 for more information about the weight, weight combination, and scenarios.
3.4 Installation
For the safe lifting procedure, please refer to section 3.4 “Lifting of the Tank”. The Installation of
the tank shall be in a flat surface and it is preferred to be on a concrete surface or any material that
will maintain the tank stability. Please be aware of sites that are surrounded by moving cars and
trucks. Please keep a distance between any objects that might surround the MFS and can interfere
with filling operation to the tank and off the dispenser.
3.5 Electrical
In order to fully operate the MFS, the electricity that will be supplied shall be 240 V single phase
with a frequency 50 Hz. Changing the provided voltage amount can cause damages and might
prevent the MFS from operating safely and smoothly. Electricity can be provided to the MFS by
using the power input plug. The MFS also uses a voltage stabilizer unit. Please refer to section
1.3 part number 17 to locate it.
Earthing the MFS shall be done using the Ground Reel located in the rear section of the MFS,
where the infeed line is located. The string is pulled and attached to any ground nearby such as the
truck filling the tank. This can be done while the filling of the tank is being done. The MFS is
Содержание Mobile Filling Station
Страница 12: ...Copyright 2020 Al Rakeb Oil Electricity Construction Services Company Kuwait 12 Figure 8 Control room entrance...
Страница 13: ...Copyright 2020 Al Rakeb Oil Electricity Construction Services Company Kuwait 13 Figure 9 Shows the control room...
Страница 43: ...Copyright 2020 Al Rakeb Oil Electricity Construction Services Company Kuwait 43 4 5 6 7...
Страница 63: ...Copyright 2020 Al Rakeb Oil Electricity Construction Services Company Kuwait 63...
Страница 64: ...Copyright 2020 Al Rakeb Oil Electricity Construction Services Company Kuwait 64...
Страница 66: ...Copyright 2020 Al Rakeb Oil Electricity Construction Services Company Kuwait 66...
Страница 68: ...Copyright 2020 Al Rakeb Oil Electricity Construction Services Company Kuwait 68...