16 (18)
ENGLISH
Content of the delivery, accessories
Installation posibilities
Use, generally
Raita
BioModule
MANUAL - INSTALLATION
Installation with BioModules; soil infiltration, biobed, thermal insulation
1.BioModules with soil infiltration:
After the biomodule (below), purified water is infiltrated into the soil. If necessary, use a larger infiltration area (20 cm
layer of macadam, or gravel) to infiltrate water (depending on conditions and soil characteristics)
2. BioModules as biobed:
After the bio module (below), water is collected by a collection pipeline to the sampling well and to an open ditch.
3.Thermatl insulation:
If the biomodule system is used all year round, it is recommended to protect it from freezing. To insulate the ground-
mounted system (1), it is sufficient to isolate the inlet sewage pipe for the pre-treatment, the pre-treatment system,
the biomodule system and the outlet sewage pipe with a horizontal installed of insulation sheets. The insulation
should extend beyond the tank and the system my dimensions by 500 mm.
The ground heat and the incoming waste heat are sufficient to keep the system working during the insulation. The
heating cable can be used in particularly difficult conditions.
4