15 (18)
ENGLISH
Content of the delivery, accessories
Installation posibilities
Use, generally
Raita
BioModule
MANUAL - INSTALLATION
Pipe connections, ventilation
The property's sewer pipe is connected to the pre-treatment inlet (sludge separator, BioBox or other device) and
the pipe leaving the pre-treatment device is connected to the distribution pipe in the BioModul system (1). In large
systems (several module rows) there may be a distribution well before the module fsystem.
If the property has waste water ventilation (3) on the roof of the building, the ventilation will be through it, unless
ventilation can be done through pipes (above the ground) from the inlet sewage piping (4).
Incoming air to the system is also needed; from the pipeline to open ditches or from an infitration, collection, or
sampling well (3).
(3)
(3)