49 3/4"
38 1/4"
73"
38"
65 1/2"
9133
6093
0075
0075
0067
6092
6091
H4
H55
H28
H17
H11
H108
H1
H108
H1
COUNTER-SUNK
HOLES MUST FACE IN
H3
229
228
235
254
254
227
246
A
B
C
1 1/4"
1 1/2"
INSET C
0075
254
2"
INSET B
9133
235
1"
1 1/4"
INSET A
0067
246
*NOTE: Pre-drill holes for all 5/16" Lag Bolts with a 1/8" Drill Bit.
1. Position Corner Posts with Top Joist Holes
(227)
(6091)
and Lower Corner Post
(228) (6092)
on the
ground with counter-sunk holes in Corner Posts
(227)
(6091)
facing in towards each other. (Diagram
shows assemblies standing up for proper assembly only.)
2. Attach Top Joist
(229)
(6093)
to Corner Posts with Top Joist Holes
(227)
(6091)
using 1/2" Hardware
(H4)
and 3/8" Hardware
(H3) (H11) (H17) (H28) (H55)
. Do not thoroughly tighten hardware at this
time.
*SUGGESTION: When installing Facias, put bottom Lag Bolts in first and check that
measurements are correct and assembly is square before inserting top Lag
Bolts.
3. Attach 6 Hole Facia
(246)
(0067)
to Corner Posts
(227)
(6091) (228) (6092)
using 5/16" Hardware
(H108)
and 1/4" Hardware
(H1)
. Facia must be flush with the bottom and outsides of Corner Posts,
and the distance between the outside faces of Corner Posts must be
38"
and
73"
as shown below.
Offset holes must be up (as shown in Inset A).
4. Measure up
65 1/2"
on Lower Corner Post
(228)
(6092)
and center Corner Post with Top Joist Hole
(227)
(6091)
and attach 2 Hole Facia
(235)
(9133)
using 5/16" Hardware
(H108)
and 1/4" Hardware
(H1)
. Offset holes must be down (as shown in Inset B).
5. Measure up
49 3/4"
and
38 1/4"
on Corner Posts
(227)
(6091) (228) (6092)
and attach 4 Hole Facias
(254) (0075)
using 5/16" Hardware
(H108)
and 1/4" Hardware
(H1)
.
Offset holes must be up (as shown in Inset C).
19
Step 1
Wall Assembly