77"
65 1/2"
40"
9132
0065
0065
0066
H1
H108
H108
H1
6090
6091
6092
6092
9133
FLUSH
FLUSH
0073
234
228
252
227
245
235
228
244
226
244
A
1 1/4"
1"
INSET A
*NOTE: Pre-drill holes for all 5/16" Lag Bolts with a 1/8" drill bit.
*SUGGESTION: When installing Facias, put bottom Lag Bolts in first and check that
measurements are correct and assembly is square before inserting top Lag
Bolts.
1. Stand up wall assemblies and attach bottom 4 Hole Facias
(244)
(0065)
to Corner Posts
(226)
(6090)
(227) (6091) (228)
(6092)
using 5/16" Hardware
(H108)
and 1/4" Hardware
(H1)
. Assembly must
measure
40"
when properly assembled and offset holes in Facias should be down (as shown in
Inset A).
2. On Lower Corner Posts
(228)
(6092)
, measure up
65 1/2"
and attach 2 Hole Facia
(234)
(9132)
(with
holes up) using 5/16" Hardware
(H108)
and 1/4" Hardware
(H1)
.
3. Attach Arched Facia
(245)
(0066)
to Corner Posts
(226)
(6090) (227) (6091)
using 5/16" Hardware
(H108)
and 1/4" Hardware
(H1)
. Arched Facia
(245) (0066)
should be
77"
up and flush with the
Arched Facia w/Hole
(252)
(0073)
.
4. Make sure assembly is square, then finish tightening hardware from Step 1 on page 19.
21
Step 3
Wall Assembly