6. Installation
6.1 Base foundation installation
6.4 AC power installation procedure
6.5 Crossarm installation procedure
6.7 Communications peripherals
6.8 Lightning rod installation
6.12 Sealing and desiccating the enclosure
6.1 Base foundation installation
The following components included with the WS-PRO2 are used for this installation procedure:
(3) 16 mm (5/8 in) anchor L-bolts
(9) 16 mm (5/8 in) nuts
(1) anchor template
The pole attaches to a user-supplied concrete foundation constructed as shown in
13).
Section 6. Installation
12
Содержание WS-PRO2
Страница 9: ...FIGURE 3 4 WS PRO2 bottom layer Section 3 Initial inspection 5...
Страница 113: ......