CAUTION:
Avoid dangerous electrical accidents when using the AC power option by locating the
transformer remotely and burying a low voltage line to the station. The low voltage will
carry up to 152 m (500 ft) on an 18 AWG power cable.
2. Shut off 110 VAC power at the main breaker.
3. Connect the primary leads of the power supply to the 100 to 240 VAC power source.
4. Connect a two-conductor cable to the secondary terminals of the power supply.
5. Route the cable from the power supply to the WS-PRO2 enclosure according to local
electrical codes.
6. Splice the incoming two-conductor cable to the power cable provided with the station. Use
the direct burial splice kit when splices are in a valve box or buried.
CAUTION:
The splice and wire nut must be completely immersed into the silicone gel inside the
splice tube to be waterproof.
7. Connect the power plug to the POWER connector on the back of the enclosure (
(p. 20)). Ensure that the plug is completely seated on the connector and the locking ring is
turned a quarter revolution clockwise.
Section 6. Installation
19
Содержание WS-PRO2
Страница 9: ...FIGURE 3 4 WS PRO2 bottom layer Section 3 Initial inspection 5...
Страница 113: ......