Page
10
6.0
Insert the other end of the long
sweep elbow into the center hole in
the stainless steel template. Tape
the end of the elbow with duct tape.
7.0
Take the three ½” x 12” long “L”
anchor bolts and install two (2) hex
huts on to each bolt. Insert one in
each of the holes in the template and
install one of the flat washers and a
nut to secure the anchor bolt to the
template.
Refer to
FIGURE 5
.
8.0
Take the form wire and cut it into
two (2) equal lengths. Attach one
end of one of the wires to one of the
16p nails on the form. String the
wire up over the form and to the long
sweep elbow - making a turn around
it. Continue the wire over to the
16p nail at the other corner of the
form (located on the same side of the
form as the other nail) and centering
the template and elbow attach the
wire securely to the nail. Repeat
this same process with the other
piece of form wire - going to the
opposite nails and further securing
the template, elbow and anchor bolts
in the form.
9.0
Steady the template assembly by
putting a 2” spacer between the
template and the top of the form.
Pour the concrete into the hole and
form - it will require approximately
½ yard - screed the concrete level
with the top of the form. Check to
make sure the template is correctly
orientated and centered. The bottom
of the anchor bolt threads should be
about ½” above the top of the
concrete. Check to be sure the
template is “level” in two (2)
dimensions. Use a trowel and edger
to finish the concrete.
BE SURE THAT YOU HAVE THE
TEMPLATE PROPERLY
ORIENTATED IN RESPECT TO
“NORTH”. Refer to FIGURE 4.
The template should have the two (2)
bolt holes, that are parallel with one
side of the template, on the north
side of the base.
10.0
Wait 24 hours before removing the
concrete form. Wait 7 days before
mounting the weather station to the
base.
REFER TO NEXT PAGE FOR FIGURES 4 & 5
Содержание WS-PRO
Страница 1: ...WS PRO Weather Station INSTALLATION MAINTENANCE AND TROUBLESHOOTING MANUAL November 2004 GT27145D...
Страница 2: ......
Страница 10: ...Page viii...
Страница 16: ...Page 6 FIGURE 2 MAGNETIC DECLINATION FOR THE CONTIGUOUS UNITED STATE...
Страница 21: ...Page 11 FIGURE 4 CONCRETE BASE DETAIL FIGURE 5 ANCHOR BOLT TEMPLATE DETAIL...
Страница 24: ...Page 14 FIGURE 6 EXTERNAL WIRING DETAIL AT THE PRO SH WEATHER STATION...
Страница 27: ...Page 17 FIGURE 7 EXTERNAL WIRING DETAIL AT THE PRO PH WEATHER STATION...
Страница 33: ...Page 23 FIGURE 10 SOLAR PANEL INSTALLATION DETAIL...
Страница 35: ...Page 25 FIGURE 11 CROSS ARM MOUNTING INSTALLATION OF 034A WIND SENSOR...
Страница 48: ...Page 38 FIGURE 21 INSTALLATION AT CENTRAL COMPUTER FOR DIRECT CONNECTED WEATHER STATION...
Страница 50: ...Page 40 FIGURE 22 INSTALLATION AT CENTRAL COMPUTER FOR TELEPHONE CONNECTED WEATHER STATION...
Страница 73: ...Page 63 FIGURE 28 TYPICAL 3 ROD GROUNDING GRID DETAIL...
Страница 74: ...Page 64 2 Ht o E 2 p i n s 1 t o 3 4 2 Ht o A G p i n s 1 t o 2 FIGURE 29 TESTING OF WIND SENSOR...
Страница 75: ...Page 65 FIGURE 30 TESTING OF SOLAR RADIATION SENSOR...
Страница 76: ...Page 66 FIGURE 31 TESTING OF RAIN GAGE...
Страница 77: ...Page 67 FIGURE 32 TESTING OF TEMPERATURE RELATIVE HUMIDITY SENSOR...
Страница 78: ...Page 68 FIGURE 33 TESTING OF AIR TEMPERATURE PROBE...