- 11 -
4. GETTING STARTED
Switching on the balance:
Press «On/Off» button on terminal overlay. The balance carries out
an internal testing procedure, and after its completing it is ready for
use.
Caution:
If the balance is incorrectly leveled,
then on switching on it displays a
alert ordering leveling the balance.
The leveling procedure on described
in ch. 5.
If a balance is turned off by
pressing «On/Off» button, then its
restart is carried out by:
repeated pressing of the
«On/Off» button, or
touching an OPTIONAL
place on the display area
Switching off the balance:
Press «On/Off» button on terminal overlay. The display is blanked,
and a signal diode lights up.
5. BALANCE LEVELING
The balance 3Y series feature a built-in electronic level sensor that continuously
monitors balance’s level status during its operation. On detecting any level change
the sensor indicates a command for readjusting the level. The level status is
continuously indicated in the upper right corner of balance’s display, next to date and
time.
CAUTION:
The first leveling of a balance using the electronic level can be carried out after 2
hours from plugging the balance to mains. This time interval is needed to thermally
stabilize the measuring section of the level monitoring system. Within this time
interval, the level monitoring pictogram visible in the upper bar of the display is
flashing. After activating the level control function the blue coloured dot of level status
is not displayed in the level control pictogram.
Содержание MYA 0,8Y
Страница 2: ...2 APRIL 2013...