
33
Manual
–
AlphaAir Freshbox 25 Basic
8.4
Marking the drill holes
The unit is usually fastened to the
wall with 4 screws and dowels. The
wall must be load-bearing and
vertical.
A slight outward inclination
of the top of the unit is
tolerable, while an inward
inclination
must
be
prevented
by
suitable
compensation measures.
Due to the condensation to be drained off, mounting
in landscape format is also not possible.
To mark the drill holes, hold the enclosed cardboard drilling
template vertically against the wall.
Only a minimal inclination to the right may be
tolerated in case of doubt.
The template can also be temporarily fixed to the wall with
some adhesive tape. Now use a pointed object to transfer the
4 fixing points and the center points for the two core drill holes
to the wall. Using a 6 mm masonry drill bit, now drill both the
four holes for the dowels and the center holes for the
ventilation pipes. The latter already with a slight outward
slope.
Содержание AlphaAir Freshbox 25
Страница 1: ...AlphaAir Freshbox 25 with humidity sensor Manual January 2021 ...
Страница 59: ...59 Manual AlphaAir Freshbox 25 Basic 18 Energy efficiency label ...
Страница 66: ......