4. Assembly
4.1. General warnings
The boiler must be set correctly for proper operation!
The boiler is supplied with an external coating containing insulation, 30mm thick.
The position of the silo and the mechanism of transport of pellets is a standard factory right in
relation to the boiler. It is possible to order the factory assembled and left variant. Also, if you
need to easily make changes in the field because the silos and the whole mechanism
disassemble dosing in relation to the boiler. Electrical connections easy switch ON easy OFF,
and reassembly is not necessary personnel specialized electrical field.
Silos for BIOmax PRO have a flexible connection with the transport mechanism, in
order to avoid vibration during operation.
Figure 3.4 Preview flexible connections
Maximum operating pressure of the boiler is 3 bar, 1 bar the minimum and
maximum operating temperature of the boiler is 110°C.
Solid fuel boiler and forced draft should be installed according to valid standards
and legal regulations. Any mechanical or electrical change in the design or
installation shall be deemed a violation of guarantee conditions and will lead to its
distortion.
In an assembly the boiler should be properly protected against the excessive
overpressure and overheating.
When installing the hydraulic installation of the boiler must be provided in a
prescribed way of overdraft maximum operating temperature and pressure.
For the proper installation the plumber/installer is responsible.
The manufacturer (Radijator Inženjering DOO) does not take any responsibility
coming from the incorrect installation of the boiler.
When any intervention on the electrical devices Radijator Inženjering DOO, the
whole system off the main power supply.