background image

Installation Manual 

SYSTEM BOILER  – Cod. 99951NA – November  2002

 

 

 

17 

Fig. 1 

Fig. 2 

MAINTENANCE  

 
To keep the boiler in efficient and safe operating condition, we 
recommend that the following checks are performed at least once 
a year (according to reference standards):  
 

• 

Check all seals on the gas components and replace gaskets 
to restore perfect seal as required.  

• 

Check all seals on the water components and replace 
gaskets to restore perfect seal as required.  

• 

Visually check combustion and the combustion chamber; 
dismantle and clean the burner if necessary. 

• 

Check the primary exchanger and clean it if necessary  

• 

Check functioning of the gas safety systems: the insufficient 
gas safety device (ionisation electrode for electronic ignition 
boilers);  

• 

Check functioning of the heating safety systems: the safety 
thermostat for temperature limit, the safety for pressure limit: 

• 

Check the flue exhaust safety device. 

• 

Check the max. and min. gas pressure and the modulation. 

• 

Check that the electrical connection conforms to the 
description in the instruction manual for the boiler. 

 

When dismantling the boilers casing, be careful when removing 
the side panels after having removed the front panel; the side 
panels are removed by undoing the lower and front fixing screws 
and then removing as shown in fig.1, lifting and then pulling away. 
The new side panels on the Midy series are connected to the 
boiler frame by means of two hooks which correspond with 
two slots on the frame to ensure quick and efficient fixing. 

 

 
 

UNPACKING 

 

A.

 Set the packed boiler down on the floor making sure 

that the arrow is pointing downwards and remove 
the staples, opening the 4 flaps outwards. 

B.

 Turn the boiler 180° supporting it by hand. 

C. 

Lift the box.  and remove the packing pieces. Lift the 

boiler by holding it at the back and proceed with 
installation.  

 
N.B.

 It is recommended that the boiler be unpacked 

before installation. The manufacturer cannot be held 
responsible for any damage caused to the boiler due to 
incorrect handling of the boiler. 
 

IMPORTANT! 

The packing materials (cardboard) are recyclable. 
 

IMPORTANT! 

The inner packing materials (plastic bags, polystyrene 
foam, nails etc.) are potentially dangerous and must not be left within reach of small children. 

 
 
 

B

C

A

Содержание RS 30 E

Страница 1: ...Specification RADIANT BRUCIATORI S p A Montelabbate PU ITALY By Technical Department INSTALLATION AND MAINTENANCE MANUAL FOR GAS FIRED ONLY HEATING WALL HUNG BOILERS SYSTEM BOILERS Model RS 20 E RS 2...

Страница 2: ......

Страница 3: ...QUIREMENTS page 5 BOILER INSTALLATION page 7 ELECTRICAL CONNECTIONS page 9 15 16 BOILER CONTROL PANEL page 10 STARTING UP THE BOILER FOR THE FIRST TIME page 10 REGULATING THE GAS PRESSURE page 12 MULT...

Страница 4: ...an expansion vessel 2 WARNINGS REGARDING INSTALLATION Warranty expires 12 months from date of installation and in all cases no later than 18 months from date of construction First start up must be pe...

Страница 5: ...KCal h 9450 12900 14560 Kw 11 15 16 90 BTU hr 37498 51187 57774 Max working pressure heating bar 3 3 3 Max working pressure water bar 6 6 6 Min working pressure heating bar 0 3 0 3 0 3 Max heating tem...

Страница 6: ...60 rotation It allows the flue exhaust into a flue duct and the air intake directly from an external wall N B To insert a bend in the flue reduce total flue length by 1 5 m R RETURN G GAS 1 2 F COLD W...

Страница 7: ...tem with 360 rotation It allows the flue exhaust into a flue duct and the air intake directly from an external wall N B To insert a bend in the flue reduce total flue length by 1 5 m R RETURN G GAS 1...

Страница 8: ...1988 Pipework that supplies the boiler must be a 22 mm ininterrupted supply from meter to the isolation cock of the boiler The complete installation must be tested for soundness as described in the a...

Страница 9: ...ulted Where the lowest part of the terminal is fitted less than 2m 6 6ft above a balcony above ground or above a flat roof to which people have access the terminal MUST be protected by a purpose desig...

Страница 10: ...ary pipe connections WATER CONNECTIONS To facilitate installation the boiler is equipped with a fittings kit IMPORTANT Before connecting the heating system pipes carefully clean the system to prevent...

Страница 11: ...e temperature falls to 5 C Heating sensor and 4 C Hot water sensor and protects the boiler down to 2 C external temperature To protect the internal Radiators a room thermostat or remote control must b...

Страница 12: ...r screws on the housing and open the electrical control box by lifting the cover as shown in fig 1 E With the electrical control box now open make the following connections Connect the yellow green wi...

Страница 13: ...e gas cock and check the gas seals making sure the counter shows no sign of leaks in any case double check by using a soapy solution and eliminate all eventual leaks The checking procedure for the gas...

Страница 14: ...gnition procedure in any case wait 3 minutes before turning the boiler off and on again then try to ignite it once more calibrate the boiler after carrying out this operation return the panel to its c...

Страница 15: ...P1 MAX HEAT trimmer to the minimum heat by turning it counter clockwise regulate the minimum pressure by turning the P2 MIN GAS trimmer see the table below for calibration pressures on completion set...

Страница 16: ...for gas leaks each time gas connections are dismantled and reassembled d replace the gas setting plate that indicates the type of gas and nominal pressure for the boiler When converting the boiler to...

Страница 17: ...IRCULATING PUMP RSL 15 6 5 GAS VALVE VK4105 6 LT 6 EXPANSION VESSEL 7 3 BAR SAFETY VALVE 8 BURNER 13 R 9 BURNER 17 R 10 HEATING SENSOR 11 WATER PRESSURE SWITCH 12 WATER PRESSURE GAUGE 13 LIMIT THERMOS...

Страница 18: ...CLOCK ROOM THERMOSTAT SUMMER WINTER SWITCH TA E I ER EA OR IMPORTANT RESPECT LIVE NEUTRAL POLARITY 19 POWER SUPPLY TERMINAL BLOCK 16 Switch E I IG 18 17 N L M2 7 5 6 9 8 PAC blue black TF 1 2 black br...

Страница 19: ...10 R6 M7 RV C 35 M7 33 EV C3 RV D6 M7 32 26 LB M5 TL 8 7 6 5 4 3 1 2 24 M5 ROOM SEALED WIRING DIAGRAM RT LOW VOLTAGE CIRCUIT MAX HEAT MIN GAS T HEAT T SAN THERMOSTATS MODULATION BLOCK SPIA 1 BAR SPIA...

Страница 20: ...ption in the instruction manual for the boiler When dismantling the boilers casing be careful when removing the side panels after having removed the front panel the side panels are removed by undoing...

Страница 21: ...Installation Manual SYSTEM BOILER Cod 99951NA November 2002 18 SHORT LIST...

Страница 22: ...TA02B101 B1203 Technical Specification RADIANT BRUCIATORI S p A Montelabbate PU ITALY ENGLISH USER MANUAL Model RS 20 E 40 60 TYPE C ROOM SEALED Model RS 24 E 70 90 TYPE C ROOM SEALED...

Страница 23: ...the boiler in efficient and safe operating condition carefully follow the instructions listed below Have normal maintenance performed at least once a year by one of our authorised service centres a fe...

Страница 24: ......

Страница 25: ...LET HAVE BEEN CAREFULLY PREPARED BUT WE RESERVE THE RIGHT TO MAKE CHANGES AND IMPROVEMENTS IN OUR PRODUCTS WHITCH MAY AFFECT THE ACCURANCY OF THE INFORMATION CONTAINED IN THIS LEAFLET E OE ALL RIGHTS...

Страница 26: ......

Страница 27: ......

Страница 28: ......

Страница 29: ......

Отзывы: