Installation Manual 

SYSTEM BOILER  – Cod. 99951NA – November  2002

 

 

 

 BOILER INSTALLATION  - MINIMUM DISTANCES FOR FIXING TO WALL 

 

To allow access inside the 
boiler for maintenance 
operations, the minimum 
distances shown in fig. 2 
must be kept. 

 

To aid installation, the 
boiler is supplied with a 
template (see fig. 1)  for 
advance location of 
connections to pipes. In 
this way, you may simply 
hook up the boiler when 
the wall fixings are 
completed (fig.1). 
 
To install the boiler 
proceed as follows (see 
fig.2): 

1. 

Use a spirit level (min. 

25mm in length) to 
draw a line on the wall 
where the boiler is to 
be installed. 

2. 

Position the top of the 

template on the line 
drawn with the spirit 
level, keeping to the recommended distances; now mark the two points 
where the two fixing screws or brackets are to go, then mark the points 
where the water and gas connections will go; 

3. 

Take away the template and proceed by connecting up the connectors 

supplied with the boiler to the hot and cold water supplies, gas system 
and heating pipes; 

4. 

Mount the boiler on the wall using the fixing screws or brackets and 

make all necessary pipe connections. 

 

WATER CONNECTIONS 

 
To facilitate installation, the boiler is equipped with a fittings kit. 

 
IMPORTANT: 

Before connecting the heating system pipes, carefully clean the system to 
prevent residual dirt from entering into circulation and negatively affecting 
boiler function. Install a funnel with discharge under the safety valve 
(calibrated to 3 bar) to collect water in case of leaking due to overpressure. No safety valve is needed for the domestic hot water 
circuit, but if the cold main inlet pressure exceeds 5 bar a pressure reducing value should be fitted. 

 

ADVICE AND SUGGESTIONS FOR DEALING WITH VIBRATIONS AND NOISE FROM THE SYSTEM 

 

 

avoid using pipelines of reduced diameter; 

 

avoid the use of tight bends and adapters in important sections; 

 

clean out the system thoroughly before connecting up the boiler in order to eliminate any residue left in the pipes and radiators. 

N.B.: 

Make sure that the water and heating pipes are not used as earth connections for electrical apparatus. 

 

120

60

100

=

790 948

80

320

24

17

125

182

24

17

KIT B

KIT A

790

450

=

894

125

320

182

60

100

870

790

790

924

KIT C

118

80

m

ax

. 3

000

80

80

Fig. 1 

G

R

R

W/VALVES

FIXING JIG

G

A

FITTINGS KIT

A

MINIMUM DISTANCES IN mm.

45

0

60

450

60

Fig. 2 

Fig. 3 

R

  HEATING RETURN ¾” 

G

 GAS ½” 

F

 COLD WATER INLET ½” 

A

 HEATING FLOW ¾” 

Содержание RS 30 E

Страница 1: ...Specification RADIANT BRUCIATORI S p A Montelabbate PU ITALY By Technical Department INSTALLATION AND MAINTENANCE MANUAL FOR GAS FIRED ONLY HEATING WALL HUNG BOILERS SYSTEM BOILERS Model RS 20 E RS 2...

Страница 2: ......

Страница 3: ...QUIREMENTS page 5 BOILER INSTALLATION page 7 ELECTRICAL CONNECTIONS page 9 15 16 BOILER CONTROL PANEL page 10 STARTING UP THE BOILER FOR THE FIRST TIME page 10 REGULATING THE GAS PRESSURE page 12 MULT...

Страница 4: ...an expansion vessel 2 WARNINGS REGARDING INSTALLATION Warranty expires 12 months from date of installation and in all cases no later than 18 months from date of construction First start up must be pe...

Страница 5: ...KCal h 9450 12900 14560 Kw 11 15 16 90 BTU hr 37498 51187 57774 Max working pressure heating bar 3 3 3 Max working pressure water bar 6 6 6 Min working pressure heating bar 0 3 0 3 0 3 Max heating tem...

Страница 6: ...60 rotation It allows the flue exhaust into a flue duct and the air intake directly from an external wall N B To insert a bend in the flue reduce total flue length by 1 5 m R RETURN G GAS 1 2 F COLD W...

Страница 7: ...tem with 360 rotation It allows the flue exhaust into a flue duct and the air intake directly from an external wall N B To insert a bend in the flue reduce total flue length by 1 5 m R RETURN G GAS 1...

Страница 8: ...1988 Pipework that supplies the boiler must be a 22 mm ininterrupted supply from meter to the isolation cock of the boiler The complete installation must be tested for soundness as described in the a...

Страница 9: ...ulted Where the lowest part of the terminal is fitted less than 2m 6 6ft above a balcony above ground or above a flat roof to which people have access the terminal MUST be protected by a purpose desig...

Страница 10: ...ary pipe connections WATER CONNECTIONS To facilitate installation the boiler is equipped with a fittings kit IMPORTANT Before connecting the heating system pipes carefully clean the system to prevent...

Страница 11: ...e temperature falls to 5 C Heating sensor and 4 C Hot water sensor and protects the boiler down to 2 C external temperature To protect the internal Radiators a room thermostat or remote control must b...

Страница 12: ...r screws on the housing and open the electrical control box by lifting the cover as shown in fig 1 E With the electrical control box now open make the following connections Connect the yellow green wi...

Страница 13: ...e gas cock and check the gas seals making sure the counter shows no sign of leaks in any case double check by using a soapy solution and eliminate all eventual leaks The checking procedure for the gas...

Страница 14: ...gnition procedure in any case wait 3 minutes before turning the boiler off and on again then try to ignite it once more calibrate the boiler after carrying out this operation return the panel to its c...

Страница 15: ...P1 MAX HEAT trimmer to the minimum heat by turning it counter clockwise regulate the minimum pressure by turning the P2 MIN GAS trimmer see the table below for calibration pressures on completion set...

Страница 16: ...for gas leaks each time gas connections are dismantled and reassembled d replace the gas setting plate that indicates the type of gas and nominal pressure for the boiler When converting the boiler to...

Страница 17: ...IRCULATING PUMP RSL 15 6 5 GAS VALVE VK4105 6 LT 6 EXPANSION VESSEL 7 3 BAR SAFETY VALVE 8 BURNER 13 R 9 BURNER 17 R 10 HEATING SENSOR 11 WATER PRESSURE SWITCH 12 WATER PRESSURE GAUGE 13 LIMIT THERMOS...

Страница 18: ...CLOCK ROOM THERMOSTAT SUMMER WINTER SWITCH TA E I ER EA OR IMPORTANT RESPECT LIVE NEUTRAL POLARITY 19 POWER SUPPLY TERMINAL BLOCK 16 Switch E I IG 18 17 N L M2 7 5 6 9 8 PAC blue black TF 1 2 black br...

Страница 19: ...10 R6 M7 RV C 35 M7 33 EV C3 RV D6 M7 32 26 LB M5 TL 8 7 6 5 4 3 1 2 24 M5 ROOM SEALED WIRING DIAGRAM RT LOW VOLTAGE CIRCUIT MAX HEAT MIN GAS T HEAT T SAN THERMOSTATS MODULATION BLOCK SPIA 1 BAR SPIA...

Страница 20: ...ption in the instruction manual for the boiler When dismantling the boilers casing be careful when removing the side panels after having removed the front panel the side panels are removed by undoing...

Страница 21: ...Installation Manual SYSTEM BOILER Cod 99951NA November 2002 18 SHORT LIST...

Страница 22: ...TA02B101 B1203 Technical Specification RADIANT BRUCIATORI S p A Montelabbate PU ITALY ENGLISH USER MANUAL Model RS 20 E 40 60 TYPE C ROOM SEALED Model RS 24 E 70 90 TYPE C ROOM SEALED...

Страница 23: ...the boiler in efficient and safe operating condition carefully follow the instructions listed below Have normal maintenance performed at least once a year by one of our authorised service centres a fe...

Страница 24: ......

Страница 25: ...LET HAVE BEEN CAREFULLY PREPARED BUT WE RESERVE THE RIGHT TO MAKE CHANGES AND IMPROVEMENTS IN OUR PRODUCTS WHITCH MAY AFFECT THE ACCURANCY OF THE INFORMATION CONTAINED IN THIS LEAFLET E OE ALL RIGHTS...

Страница 26: ......

Страница 27: ......

Страница 28: ......

Страница 29: ......

Отзывы: