15
R1K 34 - RAD - ING - Man.Inst. - 1901.1_firm.L224C_AHS
1 Check Lis
t_R1K 34_V3_EN
1. INSTALLATION
INST
ALLER
1.1.9. CHECK LIST
L
N
Se
Se
Ta
Ta
+
+
1.
Cap
Remove
3.
Cap
Replace
2.
Ensure
impeller
is free
Loosen
“Refer to Pg 17 for more
details”
1.
Ensure Water Pressure 1.2 Bar
“Refer to Pg 17 for more details”
2.
Install room
thermostat
Remove
thermostatic
loop after
commissioning
R1K 34 Check List
“Refer more
“Refer to Pg 22 for more details”
PUMP
Gas Valve
Auto Air Vent
Pressure Gauge
Control Panel
“F33”
Will appear when you first turn on the boiler.
This is just a air purge function and will last for
5 mins
.
(Please Allow This Cycle To Finish)
“Refer to Pg 31 for more details”
Loosen
to Pg 17 for
details”
to increase %
“Refer to Pg 32 for more details”
Use position 1 to adjust maximum Co2 %
Natural Gas 9.45 - 9.25%
LPG 10.55 - 10.35%
Note: Turn screw anti-clock wise to
increase %
“Refer to Pg 32 for more details”
Use position 2 to adjust minimum Co2 %
Natural Gas 9.05 - 9.25%
LPG 9.9 - 9.7%
Note: Turn screw clock wise