43
R1K 75 - RAD - ING - Man.Inst. - 1901.1_
SK.2
_con_PA_AHS
2 Ac
ces
so e pr
ogr
ammazione
dei
par
ametri_sol
o risc_MIAH4_R1K
100_SK.2_EN
2. FIRST START-UP
SUPPOR
T
CENTRE
5.
Press the key ‘
’ to confirm the action
and wait for the display to stop blinking,
indication of the fact that the adjustment was
implemented.
6.
To exit the parameters menu, hold at the same
time the keys ‘
’ and ‘
’ and wait for the
symbol ‘
’ to appear on the display.
7.
In order for the modifications performed by
the master control panel be set even on the
slave board, switch off and on the power to
the boiler. Wait the necessary time for the
operation, about 30 seconds, until the symbol ‘
’ no longer appears on the display.