A
B
C
D
Installing the CUBE
We recommend installing the CUBE in the following order:
A. Connect the water supply
B. Connect the CUBE to the Quooker tank
C. Install the CO₂ cylinder
D. Prepare the CUBE for use
The illustration below shows an example of a CUBE installation with a Quooker Flex tap and
a PRO3 tank, and is for illustration purposes only. The CUBE installation is the same for all
compatible Quooker tanks and taps. All installation guides are available online at
www.quooker.co.uk