*QRD Series excluded
50253-100
mnchkl
st
.doc
MAINTENANCE SCHEDULE CHECKLIST
Use this form to develop a routine maintenance schedule and record
of performed maintenance. In the numbered columns enter the
initials of the
person who performed the maintenance and the date. Enter additional
maintenance procedures in the s
paces provided in the left h
and column as
needed per your application.
Equipment operating under humid or dirty conditions may
require shorter intervals between scheduled maintenance.
The instruction manual provided with Quincy Compressor products, as
well as any instructions supplied by manufacturers of suppo
rting
equipment, should be read and understood prior to performing maintenance.
NOTE: Make y
our entries on a copy
of this form. Retain this original form to make more copies in the future.
Suggested Weekly
(40 hrs.) Intervals
Maintenance
Procedures
1
2
3 4 5 6 7 8 9
10
11
12
•manually test pressure relief valves
•
•clean surfaces of intercooler
•
•check distribution system for leaks
•
•check for contaminated lubricant *
•
•c
heck f
o
r compressor/
v
a
cuum leaks
•
•
Suggested Monthly
(160 hrs.) Intervals
Maintenance Procedures
1
2
3
•check belt tension (if applicable)
•
•torque sheave fasteners (if applicable)
•
•change lubricant (& filter if applicable)*
•
Содержание QR-25 210
Страница 42: ......