![Quietside QVM9 Series Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/quietside/qvm9-series/qvm9-series_manual_773382031.webp)
29
QVM 9
Series
Confirm type of fuel gas supplied.
(Natural or LP. Gas)
Check for gas leaks (Use soapy water on
the piping and connections to check for any
gas leakage).
Ensure that the electric power source is AC
115V/60Hz.
Fill the siphon reservoir in the water heater
with water. If no water is available, do not
operate the water heater(refer to page 21).
Turn #1 DIP switch to
“
ON
”
position (Trial
Operation mode).
Install the room thermostat, FR-5. Power
lamp will flash 1 second
–
ON, 1 second
–
OFF during trial operation.
Open the manual water inlet valve connected
to the water heater.
Connect main power.
The circulation pump in the water heater will
be operating and the heating piping will be
filled with water by means of the automatic
water filling system.
Test Operation and Checks
Trial Operation
STEP 1
STEP 2
STEP 3
STEP 4
STEP 5
STEP 6
STEP 7
STEP 8
STEP 9
Содержание QVM9 Series
Страница 4: ...QVM 9 Series 2 Model QVM 9 090W1 NG 125W1 NG 150W1 NG Identifying the Components...
Страница 22: ...QVM 9 Series 20 Schematic of SCF 9 Installation Installation of the Flue...
Страница 26: ...QVM 9 Series 24 Thermostat Model FR 5 Using the Thermostat FR 5...
Страница 38: ...QVM 9 Series 36 Wiring Diagram Error Codes FR 5 Thermostat DIP S W Setting on Main Controller Wiring Connecters...
Страница 39: ...37 QVM 9 Series Wiring Diagram...
Страница 41: ...39 QVM 9 Series Models QVM9 090W1 NG 125W1 NG 150W1 NG Exploded Views...