20
EN
INSTALLATION AND USE MANUAL QUICK
XR7
- REV001A
XR7
4 - Installation
F
90°
90°
90°
45°
45°
A)
When the ideal position has been established, drill four holes using the drilling template provided.
B)
Remove excess material from the chain passage, refine and flatten with a specialized product (marine paint, gel coat or two pack
epoxy) to assure free passage for chain.
C)
Place the upper section of the windlass.
D)
Fasten it by screwing the nuts on the fixing stud bolts.
E)
Fit the O-ring in the flange.
F)
Fasten the flange to the base insert using the 6 screws.
G)
Fit the motorgearbox to the windlass shaft.
H)
Tighten with the set of
screws.
ELECTRIC MOTOR
Connect the supply cables from the windlass to
the mains (AC).
HYDRAULIC MOTOR
Connect the hoses deriving from the se-
lector valve to the flanges of the hydraulic motor (see connection
diagram on page 13).
WARNING:
before wiring up, be sure the electrical cables are
not live.
4.1 Fitting procedure
90°
HYDRO
AC
A
B
45°
POSITION OF GEARMOTOR &
HYDRAULIC MOTOR
ELECTRICAL
Depending on the type of gearmotor, rotation is possible
every 45° or 90°.
HYDRAULIC
Depending on the type of motor, rotation is possible every 90°
Tighten screws and nuts following a cross pattern, referring to the tightening values provided in the table (page 4).
Apply thread lock on the screws supplied. Periodically check the proper fixing of the screws.
Nm
Nm
O-RING
WASHER
STUD
GROWER
NUT
FLANGE
SCREW
BASE
INSERT
D
E
F
C
WASHER
SCREW
GROWER
H
G
The whole XR series is equipped
with the gypsy band brake with
mobile fixing block allowing to
steer the hand wheel in several
possible positions..
Содержание XR7 4000 AC DX
Страница 31: ......