background image

Unpacking the Scalar 50 Tape Library

5

Scalar 50 Tape Library

Figure 2  Unpacking the Scalar 
50

4

Remove the antistatic sheet:

a

Cut the tape strips securing the sheet.

b

Fold the sheet down.

c

With the help of a second person, lift the library up off of the antistatic sheet.

d

Place the library Scalar 50 the table or desk next to the antistatic sheet.

e

If this is a multiple library stack, see 

Multiple Library Stacks

 on page 36 before 

proceeding.

The Scalar 50 is ready to install.

Accessory kit

Foam

Scalar 50 
tape library

Foam

Front bezel

Lift point

Содержание Scalar 50

Страница 1: ...rs to complete Note Notes emphasize important information related to the main topic Caution Cautions indicate potential hazards to equipment and are included to prevent damage to equipment Warning War...

Страница 2: ...le 1 contains the rack requirements for the Scalar 50 tape library Table 1 Rack Requirements Environmental Conditions 0The installation site must have the following environmental conditions Humidity 2...

Страница 3: ...ncluded in accessory kit Taking ESD Precautions 0Some components within the Scalar 50 tape library contain static sensitive parts To avoid damaging these parts while performing installation procedures...

Страница 4: ...he accessories kit contains all of the parts necessary for installing the Scalar 50 in a rack 2 With the help of a second person lift the library chassis up and out of the shipping carton 3 Place the...

Страница 5: ...the sheet down c With the help of a second person lift the library up off of the antistatic sheet d Place the library Scalar 50 the table or desk next to the antistatic sheet e If this is a multiple l...

Страница 6: ...the hole pattern to ensure that the library does not interfere with other devices in the rack See table 2 for information on common rack hole types Table 2 Rack Hole Types Figure Description Note The...

Страница 7: ...k to become top heavy and unstable if installed in the top of an empty rack Begin installing the Scalar 50 tape library from the bottom of the rack if more than one library is installed Note If this i...

Страница 8: ...d screws M5 x 10 for shelf assembly 8 PN 74 87575 01 T nuts M5 4 metric and 4 standard PN 74 88052 01 metric PN 74 88053 01 standard Rail adapters both metric and standard holes are included 8 total a...

Страница 9: ...Shelf Depth Requirements Use these holes for rack depths of 27 in 68 5 cm to 36 in 91 4 cm Use these holes for rack depths of 24 in 60 9 cm to 28 in 71 1 cm Left shelf oriented with FlexLink opening...

Страница 10: ...5 x 10 Allen screws T nuts T nuts Left hand rack mount shelf Right hand rack mount shelf T nuts must be oriented as shown to properly fit in the shelf adjustment slot T nuts must be oriented as shown...

Страница 11: ...ted either metric or standard see figure 6 Figure 6 Rail Adapter Types Use the rail adapters with blocks on rails with square hole patterns Use the rail adapters with circle pegs opposite blocks on ra...

Страница 12: ...ith 2 M5 x 10 Allen screws per adapter see figure 7 Figure 7 Assembling the Left Hand Rack Mount Shelf M5 x 10 Allen screws Rail adapter Left shelf FlexLink opening located towards the back for the ri...

Страница 13: ...ck mount shelves adjust 27 in to 36 in and secure with the following parts in four locations see figure 8 Mounting plate 2 M4 x 12 Allen screws Figure 8 Installing the Rack Mount Shelves Note The rack...

Страница 14: ...Guide 3 Once the rack mount shelves are secured to the rack tighten the Allen screws securing the adjustable shelves right and left together see figure 9 Figure 9 Tightening the Rack Mount Shelves Ti...

Страница 15: ...ary Note If the depth of the rack is less than 27 in do not install the back mounting brackets or clamps Rack Depth Back Mounting Bracket Mounting Position Back Mounting Clamp 1 Holes 2 Holes 24 to 25...

Страница 16: ...e Back Mounting Brackets 34 5 to 35 5 in Use holes F and H X 35 5 to 36 5 in Use holes G and I X Note If your rack has a depth less than 27 in the back brackets and back clamps are not used Rack Depth...

Страница 17: ...as shown in figure 12 and secure the library to the rack with four Phillips screws Note If this is a multiple stack configuration see Multiple Library Stacks on page 36 for information on preparing t...

Страница 18: ...mounting clamps see table 4 for information on the correct mounting holes to use and two M5 x 10 Allen screws on each clamp see figure 13 5 Secure the mounting clamps to the rack rails with two Phill...

Страница 19: ...drive cover plates if necessary some libraries ship with one tape drive installed by loosening the captive screws securing the plate to the library chassis see figure 14 Figure 14 Removing the Tape D...

Страница 20: ...lowing cables and jumpers included in the accessory kit as shown in the following figures Figure 16 SCSI full height drives Figure 17 Native Fibre Channel full height drives Figure 18 SCSI half height...

Страница 21: ...library system controller board MUST have an offset connector Using a straight in SCSI connector may damage the system controller board Back of Library SCSI host Ethernet Power SCSI System Controller...

Страница 22: ...thernet Power Back of Library SCSI host Terminator Tape drives 1 and 2 Tape drives 3 and 4 SCSI host Terminator SCSI System Controller Board SCSI host SCSI host Back of Library Ethernet Power SAS host...

Страница 23: ...configuring the library consists of the following steps Turning on the Library Removing the Remaining Packing Materials Setting the Library Options Setting the Date and Time Setting Network Informati...

Страница 24: ...re closed and latched 2 Turn on the library by pushing power button located on the bottom left hand corner of the OCP see figure 22 Figure 22 Turning on the Library The power up sequence can take seve...

Страница 25: ...rom the library When you open the doors the OCP displays a message telling you that the doors are open 3 After the library has powered down remove the hand restraint by completing the following steps...

Страница 26: ...26 Installing the Library Scalar 50 Quick Start Guide Figure 23 Removing the Hand Restraint Hand restraint Thumb screws Robotics umbilical cable Hand restraint installed Thumb screws...

Страница 27: ...re 24 Figure 24 Storing the Thumb Screws and Restraining Bolt d Install the tape cartridge magazines e Close the front doors Note Save the hand restraint for later shipping or relocation of the librar...

Страница 28: ...e Home screen The OCP displays the Setup screen see figure 25 Figure 25 Setup Screen 7 From the Setup screen use the up and down arrows to highlight Cabinet and press Enter The Cabinet Setup screen di...

Страница 29: ...model number will also change to PX500S indicating a stacked library configuration The library model num ber is available from the home screen on the Master library OCP Left load port Enables or disab...

Страница 30: ...up screen use the up and down arrows to highlight Network and press Enter The Network screen displays see figure 28 Figure 28 Network Screen The Network screen allows you to view or edit the following...

Страница 31: ...Setup Wizard leads you through the process of setting up the most common options for this library to be operational Detailed customization options including settings modified by this wizard can be ch...

Страница 32: ...age 4 To access the Setup Wizard from the Setup page click on the Setup Wizard tab at the top of the page The Setup Wizard displays see figure 30 Figure 30 Setup Wizard 5 Click Next to continue The Se...

Страница 33: ...ine and continue The Setup Wizard Date and Time page displays see figure 32 Figure 32 Setup Wizard Date and Time 7 Set the system date and time using the Change button for the system date and drop dow...

Страница 34: ...nue The Setup Wizard Configuring Load Ports page displays see figure 34 Figure 34 Setup Wizard Configuring Load Ports 11 Enable or disable the load ports for this library 12 Click Next to continue The...

Страница 35: ...artition c Enable disable Auto Clean for this partition 14 Click Next to continue The Setup Wizard Wizard Completed page displays see figure 36 Figure 36 Setup Wizard Wizard Completed 15 Click Exit to...

Страница 36: ...nabled with full slot capacity you must initially configure the Scalar 50 libraries and enable Full capacity with a Capacity Key before configuring the cabinets as Master and Slave libraries see the S...

Страница 37: ...re see figure 38 a Install the top alignment hardware with two Allen head screws b Install the bottom alignment hardware with one Allen head screw Note Install only the bottom alignment hardware on th...

Страница 38: ...y Stacks Scalar 50 Quick Start Guide Figure 38 Installing the Alignment Hardware The libraries are prepared for installation in a multiple stack Top alignment hardware Screws Screws Bottom alignment h...

Страница 39: ...a Health Check 0Running a health check will verify all robotics axis and ensure that the library is operating normally To run a health check 1 On the host computer open the internet browser software...

Страница 40: ...ies Page 5 The library must be offline prior to running a health check Click Offline The library goes offline 6 Click the System Test tab at the top of the page The System Test page displays see figur...

Страница 41: ...rary stack configuration 1 To access the Move page from the Operations page click on the Move tab at the top of the page The Move page displays see figure 42 Figure 42 Move Page 2 To move a cartridge...

Страница 42: ...2 A01 July 2008 Scalar 50 Quick Start Guide 81 81767 02 A01 81 81767 02 A01 g Click Apply The tape cartridge moves from the bottom library cabinet into the top library cabinet If the move completes wi...

Отзывы: