![Quantum Scalar 50 Скачать руководство пользователя страница 41](http://html2.mh-extra.com/html/quantum/scalar-50/scalar-50_quick-start-manual_3560451041.webp)
Testing the Library Configuration
41
Scalar 50 Tape Library
7
Select the new library cabinet from the cabinet drop down list.
8
Click the
Start Test
button.
The system performs a health test on all robotic axis. The test results can be viewed at
the bottom of the page. If any failures occur, contact Quantum.
Testing a Multiple Library
Stack Configuration
0
If this is a multiple library stack configuration, you must verify the tape cartridge pass
through capability to ensure normal library operation.
To test a multiple library stack configuration:
1
To access the
Move
page, from the
Operations
page, click on the
Move
tab at the top of
the page.
The
Move
page displays (see
figure 42
):
Figure 42 Move Page
2
To move a cartridge:
a
In the
Source Partition
, select the bottom most cabinet in the library stack.
b
In the
Source Element
, select a slot.
c
In the
Source Position
, select a slot number containing a tape cartridge.
d
In the
Destination Partition
, select the top most cabinet in the library stack.
e
In the
Destination Element
, select a slot.
f
In the
Destination Position
, select an empty slot number.
Note:
The following procedure requires at least one tape cartridge in the bottom most
library in the library stack.
Destination
Source
Move cartridge