Quantum QS-500 Series Скачать руководство пользователя страница 51

 

Model QS-500 Tubestand 

OVERVIEW 

The Tubestand will function reliably when maintained according to the instructions 
provided in this chapter. 

WARNING!  Only properly trained service personnel should se

WARNING!  Only properly trained service personnel should se

WARNING!  Only properly trained service personnel should se

r-

r-

r-

vice or maintain this equipment.  Failure to follow manufa

vice or maintain this equipment.  Failure to follow manufa

vice or maintain this equipment.  Failure to follow manufa

c-

c-

c-

turer's or service personnel's recommendations may result in 

turer's or service personnel's recommendations may result in 

turer's or service personnel's recommendations may result in 

serious injury.

serious injury.

serious injury.

 

 

 

USER MAINTENANCE 

The equipment user is responsible for the basic cleanliness of the equipment. 
On a regular basis, painted metal surfaces should be cleaned using a clean 
cloth slightly moistened in warm soapy water (use mild soap). Wipe with a 
clean wet cloth. 

CAUTION!  Never use abrasive polish on this eq

CAUTION!  Never use abrasive polish on this eq

CAUTION!  Never use abrasive polish on this eq

uipment.

uipment.

uipment.

 

 

 

PLANNED MAINTENANCE 

Routine inspection and maintenance of the Tubestand should be performed by 
qualified service personnel on an annual basis.

 

WARNING!  Personnel engaged in maintenance activities 

WARNING!  Personnel engaged in maintenance activities 

WARNING!  Personnel engaged in maintenance activities 

should exercise normal caution and care while work

should exercise normal caution and care while work

should exercise normal caution and care while work

ing with 

ing with 

ing with 

electro

electro

electro

-

-

-

mechanical equipment. Before removing or opening any 

mechanical equipment. Before removing or opening any 

mechanical equipment. Before removing or opening any 

electrical power panels or covers, verify that the incomin

electrical power panels or covers, verify that the incomin

electrical power panels or covers, verify that the incomin

power supply is turned OFF. In the event maintenance proc

power supply is turned OFF. In the event maintenance proc

power supply is turned OFF. In the event maintenance proc

e-

e-

e-

dures require power to be supplied to the unit, extreme care 

dures require power to be supplied to the unit, extreme care 

dures require power to be supplied to the unit, extreme care 

MUST be exercised to insure the safety of service or other pe

MUST be exercised to insure the safety of service or other pe

MUST be exercised to insure the safety of service or other pe

r-

r-

r-

sonnel in the area.  Verify that the equipment is properly 

sonnel in the area.  Verify that the equipment is properly 

sonnel in the area.  Verify that the equipment is properly 

grounded before attempting any electrical operation.

grounded before attempting any electrical operation.

grounded before attempting any electrical operation.

 

 

 

39 

Chapter 5 Maintenance

 

Содержание QS-500 Series

Страница 1: ...Manual Part No DC30 005 Revision B Model QS 500 Series Installation and Operation Manual Floor to Ceiling Wall Tubestand...

Страница 2: ...x 631 567 5074 This manual is copyrighted and all rights are reserved No portion of this document may be copied pho tocopied reproduced translated or reduced to any electronic medium or machine readab...

Страница 3: ...bestand i Revision History REVISION HISTORY REVISION DATE TYPE OF MODIFICATION A 10 18 00 Initial Release B 2 15 00 Added UL Mark Page Number Rev Page Number Rev Page Number Rev i x B 1 44 B LIST OF E...

Страница 4: ...Model QS 500 Tubestand THIS PAGE INTENTIONALLY LEFT BLANK ii Revision History...

Страница 5: ...Model QS 500 Tubestand Table of Contents Section 1 Introduction 1 Section 2 Specifications 5 Section 3 Assembly Installation 11 Section 4 Operation 31 Section 5 Maintenance 37 iii Table of Contents...

Страница 6: ...Model QS 500 Tubestand Table of Contents THIS PAGE INTENTIONALLY LEFT BLANK iv...

Страница 7: ...ous injuries X RAY PROTECTION X rays are hazardous to both patient and operator unless established safe exposure factors and operating instructions are observed It is important that everyone having an...

Страница 8: ...ostic X Ray Systems and Their Major Compo nents and NCRP Report No 102 Medical X Ray Electron Beam and Gamma Ray Protection for Energies Up to 50 MeV Equipment Design and Use as revised or replaced in...

Страница 9: ...from the time of original installation the date of which will be determined by a completed returned warranty card which must be returned within 30 days of system installation In no case shall the warr...

Страница 10: ...tum Medical Imaging 2 Failure of Buyer Dealer to provide the proper incoming power required to sup port the equipment in accordance with the recommendation of QMI 3 Any modification of product perform...

Страница 11: ...arts shall become the property of Quantum Medical Imaging The preceding Paragraphs set forth Buyer s Remedies and Quantum Medical Imaging s sole liability for claims based upon failure of the product...

Страница 12: ...Model QS 500 Tubestand THIS PAGE INTENTIONALLY LEFT BLANK Warranty Information x...

Страница 13: ...Chapter INTRODUCTION 1 1...

Страница 14: ...2...

Страница 15: ...or to wall mounting option using optional Wall mount tracks Electromagnetic locks for vertical fail safe longitudinal and angulation Tubestand motions 40 and 72 SID indicators metric equivalents avail...

Страница 16: ...Tubestand contains 1 X Ray Tube 2 Handgrips 3 Wall Ceiling Track 4 Support Arm 5 Vertical Column 6 Serialization Label 7 Base Assembly 8 Floor Track 9 Collimator 4 Chapter 1 Introduction Figure 1 Flo...

Страница 17: ...5 Chapter SPECIFICATIONS 2...

Страница 18: ...6...

Страница 19: ...19 2 mm 8 Track 72 0 inches 1828 8 mm 10 Track 96 0 inches 2438 4 mm Tube Angulation 270 135 Detents at 0 90 CW 90 CCW Counterbalancing Counterweight trim weight adjustable Minimum Focal Spot to Floor...

Страница 20: ...eet construction performance criteria per UL 2601 1 Electrical Interfacing Tubestand mounted terminal strip for interfacing 24 VDC tray sensing sig nals with automatic collimator only Handgrip Specifi...

Страница 21: ...fications for the Tube Stand System Operating Environment Ambient Temperature 10 C to 40 C Relative Humidity 20 to 80 non condensing Altitude 30 5 to 2440 meters relative to sea level Non Operating En...

Страница 22: ...Model QS 500 Tubestand 10 Chapter 2 Specifications Figure 2 Model QS 500 Tubestand Dimensions...

Страница 23: ...11 Chapter ASSEMBLY INSTALLATION 3...

Страница 24: ...12...

Страница 25: ...the minimum distance between the rear wall and the back surface of the Vertical Column is 3 2 inches 79 mm with a ceiling mounted Tubestand and 5 7 inches 144 mm with a wall mounted Tubestand Install...

Страница 26: ...r damage during shipment after unit is picked up by the carrier Should there be a shortage of parts notify Quantum Medical Imaging s Service Department INSTALLATION INSTRUCTIONS When the Tubestand is...

Страница 27: ...Vertical Column Base Installation 1 Remove the shipping bolt located in the Tubestand Base see Figure 3 2 Remove the Stop Bumpers from the Top Track and Floor Track at the end of the track where you...

Страница 28: ...Chapter 3 Assembly Installation 16 Figure 4 Tubestand Installed on Floor Track FLOOR TRACK BASE ASSEMBLY Figure 3 Removing the Shipping Bolt SHIPPING BOLT BASE ASSEMBLY BOTTOM VIEW fit the Top Trolley...

Страница 29: ...olley Extension 7 Remove the Top Trolley Wheel from Extension and cut the Top Trolley Ex tension to correct length 8 Insert the Top Trolley Wheel in the Top Track and secure it to the Top Trol ley Ext...

Страница 30: ...y on the an ode side Proceed as follows 1 Insert the Longitudinal Brake Assembly into the slot located in the rear side of the Base Assembly see Figure 7 2 Loosely mount the Longitudinal Brake Assembl...

Страница 31: ...can be made by moving the Floor Track in or out from wall Ensure the Vertical Column is level throughout the full length of longitudinal travel 3 Secure the Floor Track to floor using appropriate fast...

Страница 32: ...e specific instructions supplied by the collimator man per the specific instructions supplied by the collimator man per the specific instructions supplied by the collimator manu u u fa fa fac c cturer...

Страница 33: ...hapter 3 Assembly Installation 21 HANDGRIPS 1 4 20 X 1 HEX HEAD SCREWS AND LOCK WASHERS 4X Figure 11 Handgrips Installed D CONNECTOR COLLIMATOR MOUNTING PLATE X RAY TUBE Figure 10 Tube and Collimator...

Страница 34: ...ack is level then level Support Arm Transverse Arm as follows a Loosen four 4 3 8 16 x 1 hex head cap screws securing Sup port Arm to Vertical Trolley see Figure 13 b Adjust set screws as required to...

Страница 35: ...up and down motion of the tube head 2 If additional weights are necessary add trim weights at the rear side of the Vertical Column see Figure 14 Chapter 3 Assembly Installation 23 Figure 15 Trim Weigh...

Страница 36: ...0 32 x 1 2 socket head cap screws and flat washers 2 Using a switch actuator placed on the Floor Track as a reference do not peel off adhesive backing at this time adjust the height of the switch so t...

Страница 37: ...ssembly to the lower section of an ode side Cable Clamp using two 2 10 32 x 1 4 socket head cap screws 3 Using a switch actuator placed on the Vertical Column as a reference do not peel off adhesive b...

Страница 38: ...ulated and meet construction performance criteria per UL 2601 1 Connect the 24 VDC input to terminal board TB1 1 and the 24 VDC RTN input to TB1 2 refer to Tubestand Interconnect Diagram Figure 17 Ter...

Страница 39: ...the cable clamps on the Vertical Trolley along with the cables from the collimator Handgrip Assembly Angulation Lock Assembly and Vertical SID Switch Assembly by installing upper halves of Ca ble Clam...

Страница 40: ...witch actuating arm faces towards the Vertical Column 1 Attach the Vertical SID Indicator Bracket to the bottom end of the Vertical Trolley This is done by inserting the end of the bracket with square...

Страница 41: ...able SID 2 Affix label on column so that the 40 100 cm mark lines up with the arrow in the table SID window of the SID Indicator Bracket ALIGNMENT OF THE SYSTEM Once installed the Tubestand must be al...

Страница 42: ...imiting devices Collimator Light Field Versus Actual X Ray Field 1 Using any size film with cassette set the proper technique in the x ray gen erator 2 Make an exposure and develop the film to verify...

Страница 43: ...Chapter OPERATION 4 31...

Страница 44: ...32...

Страница 45: ...st be operated with reasonable care must be operated with reasonable care must be operated with reasonable care MOTIONS AND DETENTS The Tubestand provides three manual motions with mechanical detents...

Страница 46: ...Type Description 1 Longitudinal Lock Release Control Releases magnetic lock to allow tubestand longitudinal motion along floor track 2 Tube Angulation Display Indicator Indicates angle of tube rotati...

Страница 47: ...SID is at 180 cm or 72 inches Wall receptor only 7 Source to Table Receptor and Source to Table Top SID Scale Indicator Indicates distance from tube focal spot to table Film Cabinet cassette and tube...

Страница 48: ...Model QS 500 Tubestand Chapter 4 Operation 36 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 49: ...Chapter MAINTENANCE 5 37...

Страница 50: ...38...

Страница 51: ...NG Personnel engaged in maintenance activities WARNING Personnel engaged in maintenance activities should exercise normal caution and care while work should exercise normal caution and care while work...

Страница 52: ...gs and bearing surfaces for cleanliness and corrosion Clean Bearing Tracks Floor Track and Top ceiling wall Track Conduct a general inspection for worn or damaged parts Check for proper counterbalanci...

Страница 53: ...d with the model number and serial number of the unit 41 ITEM DESCRIPTION PART NUMBER QTY USED ON SYSTEM 1 SID Indicator Blue EL31 003 2 2 Pushbutton Switch Longitudinal Lock Release EL50 002 2 1 3 Pu...

Страница 54: ...in Figure 23 Horizontal SID Switch located in the Base Assembly and longitudinal actuators have the same part numbers Chapter 5 Maintenance 42 Figure 22 Model QS 500 Tubestand Parts Location Diagram...

Страница 55: ...odel QS 500 Tubestand Chapter 5 Maintenance 43 Figure 24 Model QS 500 Tubestand Parts Location Diagram 8 LONGITUDINAL MAGNET Figure 25 Model QS 500 Tubestand Parts Location Diagram 8 ROTATIONAL MAGNET...

Страница 56: ...Model QS 500 Tubestand Chapter 5 Maintenance 44 Figure 26 Model QS 500 Tubestand Parts Location Diagram 9...

Отзывы: