![Quantum QS-500 Series Скачать руководство пользователя страница 40](http://html1.mh-extra.com/html/quantum/qs-500-series/qs-500-series_installation-and-operation-manual_3538315040.webp)
Model QS-500 Tubestand
Horizontal SID Switch Actuator/Indicator Installation
Install the Horizontal SID switches actuators and indicator decals as follows:
1. Position the Tubestand at 40" and 72" SID and mark each position on Floor
Track.
2. Clean marked area with alcohol and secure actuator in marked location us-
ing double-sided tape. Check switch height to ensure activation at 40" and
72" SID.
3. Affix 40” and 72” SID indicators on Top Track at each longitudinal (wall)
SID position.
Vertical SID Switch Actuator Installation
The Vertical SID Switch actuating arm faces towards the Vertical Column.
1. Attach the Vertical SID Indicator Bracket to the bottom end of the Vertical
Trolley. This is done by inserting the end of the bracket with square cut-
out and slot into the opening between the trolley and Vertical Column. The
square opening in the bracket is then hung onto the inside of the trolley.
Pull down on bracket to ensure it is fully seated in slot.
2. Bring the Vertical Trolley down to the desired 40" SID mark on the Vertical
Column.
3. Mark the location for the Vertical SID Switch actuator.
4. Clean marked area with alcohol and secure actuator in marked location
using double-sided tape.
5. Check switch height to ensure activation at 40" SID.
Chapter 3 Assembly & Installation
28
Содержание QS-500 Series
Страница 4: ...Model QS 500 Tubestand THIS PAGE INTENTIONALLY LEFT BLANK ii Revision History...
Страница 6: ...Model QS 500 Tubestand Table of Contents THIS PAGE INTENTIONALLY LEFT BLANK iv...
Страница 12: ...Model QS 500 Tubestand THIS PAGE INTENTIONALLY LEFT BLANK Warranty Information x...
Страница 13: ...Chapter INTRODUCTION 1 1...
Страница 14: ...2...
Страница 17: ...5 Chapter SPECIFICATIONS 2...
Страница 18: ...6...
Страница 22: ...Model QS 500 Tubestand 10 Chapter 2 Specifications Figure 2 Model QS 500 Tubestand Dimensions...
Страница 23: ...11 Chapter ASSEMBLY INSTALLATION 3...
Страница 24: ...12...
Страница 43: ...Chapter OPERATION 4 31...
Страница 44: ...32...
Страница 48: ...Model QS 500 Tubestand Chapter 4 Operation 36 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 49: ...Chapter MAINTENANCE 5 37...
Страница 50: ...38...
Страница 56: ...Model QS 500 Tubestand Chapter 5 Maintenance 44 Figure 26 Model QS 500 Tubestand Parts Location Diagram 9...