background image

Quantum 2U Rackmount Rail Installation Guide

Document 81-81209-06 A01

January 2006

7

Step 3: Installing the 2U Rackmount into the Equipment Rack 

0

1

Completely extend the intermediate sections out from the front of the 
stationary sections until they lock.

2

Holding the 2U Rackmount securely, slide the chassis sections through 
the plastic lead-in guides at the front of the intermediate sections and into 
the intermediate sections.

3

Make sure that the chassis sections are both fully engaged with the ball 
bearings in the tracks of the intermediate sections.

4

Slide the 2U Rackmount all the way into the equipment rack.

5

Completely open and close the slides twice, making sure the chassis 
sections engage in the stationary sections properly and the locks function 
properly.

6

Slide the 2U Rackmount out slightly and securely tighten the front 
bracket screws onto the equipment rack’s upright rails.

7

Completely open and close the slides once more to make sure the unit 
does not bind.

8

Slide the 2U Rackmount all the way into the rack and secure it in place by 
tightening the thumbscrews on each side. See 

figure 5

.  

Figure 5  Tightening the 
Thumbscrew

Содержание LTO 2U

Страница 1: ...nt Rail Installation Guide Introduction 3 Required Tools 3 Step 1 Installing the Chassis Sections onto the 2U Rackmount Chassis 4 Step 2 Installing the Stationary Sections onto the Equipment Rack 5 St...

Страница 2: ...without notice COPYRIGHT STATEMENT Copyright 2006 by Quantum Corporation All rights reserved Your right to copy this document is limited by copyright law Making copies or adaptations without prior wri...

Страница 3: ...o the Equipment Rack on page 5 Step 3 Installing the 2U Rackmount into the Equipment Rack on page 7 Required Tools 0 To install the slide rails you may need the following additional items Available ra...

Страница 4: ...to the intermediate section Press the green lock release toward the front to release the chassis section and remove the chassis section See figure 1 Figure 1 Removing the Chassis Section 2 Install the...

Страница 5: ...ate Section 2 Loosely install the left and right stationary sections onto the equipment rack using 8 M6 pan head PHILLIPS screws The ends of the stationary sections go on outside of the equipment rack...

Страница 6: ...Quantum 2U Rackmount Rail Installation Guide Document 81 81209 06 A01 January 2006 6 Figure 4 Mounting the Stationary Sections Into the Equipment Rack Upright rails right side Upright rails left side...

Страница 7: ...oth fully engaged with the ball bearings in the tracks of the intermediate sections 4 Slide the 2U Rackmount all the way into the equipment rack 5 Completely open and close the slides twice making sur...

Страница 8: ...Quantum 2U Rackmount Rail Installation Guide Document 81 81209 06 A01 January 2006 8 81 81209 06 A01 81 81209 06 A01...

Отзывы: