background image

Quantum 2U Rackmount Rail Installation Guide
Document 81-81209-06 A01
January 2006

4

Step 1: Installing the Chassis Sections onto the 
2U Rackmount Chassis

0

1

For each set of rails, pull the chassis section forward until it locks into the 
intermediate section. Press the green lock release toward the front to 
release the chassis section, and remove the chassis section. See 

figure 1

.

Figure 1  Removing the 
Chassis Section

 

2

Install the chassis sections onto the 2U Rackmount chassis using 
(6) M3 x 4 mm pan-head PHILLIPS screws. See 

figure 2

Figure 2  Installing the 
Chassis Sections Onto the 
Chassis

Stationary

section

Intermediate

section

Chassis 
section

Lock 
release

Содержание LTO 2U

Страница 1: ...nt Rail Installation Guide Introduction 3 Required Tools 3 Step 1 Installing the Chassis Sections onto the 2U Rackmount Chassis 4 Step 2 Installing the Stationary Sections onto the Equipment Rack 5 St...

Страница 2: ...without notice COPYRIGHT STATEMENT Copyright 2006 by Quantum Corporation All rights reserved Your right to copy this document is limited by copyright law Making copies or adaptations without prior wri...

Страница 3: ...o the Equipment Rack on page 5 Step 3 Installing the 2U Rackmount into the Equipment Rack on page 7 Required Tools 0 To install the slide rails you may need the following additional items Available ra...

Страница 4: ...to the intermediate section Press the green lock release toward the front to release the chassis section and remove the chassis section See figure 1 Figure 1 Removing the Chassis Section 2 Install the...

Страница 5: ...ate Section 2 Loosely install the left and right stationary sections onto the equipment rack using 8 M6 pan head PHILLIPS screws The ends of the stationary sections go on outside of the equipment rack...

Страница 6: ...Quantum 2U Rackmount Rail Installation Guide Document 81 81209 06 A01 January 2006 6 Figure 4 Mounting the Stationary Sections Into the Equipment Rack Upright rails right side Upright rails left side...

Страница 7: ...oth fully engaged with the ball bearings in the tracks of the intermediate sections 4 Slide the 2U Rackmount all the way into the equipment rack 5 Completely open and close the slides twice making sur...

Страница 8: ...Quantum 2U Rackmount Rail Installation Guide Document 81 81209 06 A01 January 2006 8 81 81209 06 A01 81 81209 06 A01...

Отзывы: