Chapter 3: F2000 Basic Operations
Power Off a Canister/System
Quantum F2000 User’s Guide
39
You can now use the new or updated user account.
Power Off a Canister/System
This procedure describes how to power off a single F2000 canister. The
F2000 contains redundant canisters, and it is designed so that the
system can run on one canister in the event that the other canister fails.
If you need to power off the entire F2000 for maintenance purposes,
you must power off both canisters and unplug the power cables from
the PSUs.
Power Off
Considerations
If you power off the entire F2000 system (both canisters), be sure to
stop all I/O from clients to avoid data loss.
Power Off Procedure
To power off a single canister or power off the entire system:
1
Access the BMC Web UI for a canister.
Note:
Refer to
on page 30 for detailed
instructions on how to access and log into the BMC Web
UI.
2
From the BMC Web UI Dashboard, click
Power Control
from the left
menu.
The
Power Control
page appears (see
Содержание F2000
Страница 1: ...User s Guide Quantum F2000 6 68750 01 Rev A...
Страница 10: ...Preface x Quantum F2000 User s Guide...
Страница 196: ...Chapter 4 F2000 Customer Replaceable Units CRUs SSD Assembly Replacement 182 Quantum F2000 User s Guide...
Страница 200: ...Glossary 186 Quantum F2000 User s Guide...