Chapter 4: F2000 Customer Replaceable Units (CRUs)
Fan Module Replacement
Quantum F2000 User’s Guide
115
8
If the system contains 32 Gb FC cards, connect the FC cables to the
FC ports in PCIe slot 1 and PCIe slot 3 on the top canister and the
bottom canister (see
9
Rotate the latch handles into the canister until the are fully engaged
(see
). This applies power to the system. The canister will
power itself on about 20 seconds after it is connected to power.
Figure 113
L
atching the
Canister (Bottom Canister
Example)
10
Verify the fan module is functioning properly:
a
Once the canister is physically powered-on, from a notebook
computer, access the BMC Web UI and log in.
Note:
Refer to
on page 30 in
Chapter 3, F2000 Basic Operations
b
In the BMC Web UI, click
Sensor
.
c
Verify that the fan module fans show a
State
of
Normal
(see
Item
Description
1
Bottom canister PCIe slot locations.
2
Top canister PCIe slot locations.
Содержание F2000
Страница 1: ...User s Guide Quantum F2000 6 68750 01 Rev A...
Страница 10: ...Preface x Quantum F2000 User s Guide...
Страница 196: ...Chapter 4 F2000 Customer Replaceable Units CRUs SSD Assembly Replacement 182 Quantum F2000 User s Guide...
Страница 200: ...Glossary 186 Quantum F2000 User s Guide...