background image

Models Q4P09H, Q4P09X & Q4P09W 

Installation, Operation and Maintenance

 

Rev 12/26/13 

Q4P09-IOM-Q.doc

 

WARNING

V

ERTICAL 

C

LEARANCE

 

Check the height of the area where the lift is to be 
installed. Clearance should be calculated based on 
the full raised height of the lift. 

Failure  by  purchaser  to 

provide  adequate  clearance 

could 

result 

in 

unsatisfactory  lift performa nce,  property 

damage, or personal injury. 

F

LOORING

 

Be certain you have the proper concrete floor to 
properly handle the loaded lift.  Floor should be in 
generally good condition with no large cracks, 
spalling or deterioration.  

Minimum  requirements  for  concrete  are  4 

inches 

minimum 

depth, 

with 

steel 

reinforcement, 3500 psi, cured for 28 days per 

local commercial practice

.  This lift is designed to 

accommodate a 3 inch total variation in elevation 
at the base of the four posts.  Floor should be level 
within 1/2 inch from side-to-side and 2 1/2 
front-to-rear to avoid special shimming.  No 
anchors should be installed within 8 inches of any 
crack, edge, or expansion joint. If these conditions 
cannot be met, a pad may be poured to 
accommodate the lift.  

Check with local building inspectors and/or permits 
office for any special instructions or approvals 
required for your installation. 

Failure  by  purchaser  to 

provide  the recommen ded 

mounting  surface  could 

result  in  unsatisfactory  lift  performance, 

property damage, or personal injury. 

L

OCATION

 

This lift has been evaluated for indoor use only 
with an operating ambient temp. range of 5 – 40°C  
(41-104°F)

 

E

LECTRICAL 

R

EQUIREMENTS

 

For  lift installation and   operation  for  single 

phase units, it is necessary to have a dedicated 

circuit with a single pole (11 5v) or Double pole 

(230v)  circuit  breaker  or  time d elay  fuse  sized 

for the following Full Load (FL) Amperage: 
The 115V power unit FL amperage is 15 amps. 

The 230V power unit FL amperage is 18 amps.  

 

For lift installation and operation with standard 
power unit, it is necessary to have a dedicated 
115V single-phase 60-cycle circuit with a 20 amp 
circuit breaker or time delay fuse 

For lift installation and operation with 230V power 
unit, refer to 

Fig 24

 

S

AFETY 

N

OTICES AND 

D

ECALS

 

For your safety, and the safety of others, read and 
understand all of the safety notices and decals 
included here. 

R

EAD ENTIRE MANUAL BEFORE ASSEMBLING

,

 

INSTALLING

,

 OPERATING

,

 OR SERVICING THIS 

EQUIPMENT

P

ROPER MAINTENANCE AND INSPECTION IS 

NECESSARY FOR SAFE OPERATION

DO

 

NOT

 OPERATE A DAMAGED LIFT

.

 

Safety decals similar to those shown here are 
found on a properly installed lift. Be sure that all 
safety decals have been correctly installed on the 
Power Unit reservoir. Verify that all authorized 
operators know the location of these decals and 
fully understand their meaning. Replace worn, 
faded, or damaged decals promptly. 

Do  not  attempt  to  raise  a 

vehicle  on t he  lift until the  

lift  has b een  correctly 

installed  and  adjusted  as  described  in  this 

manual.  

 

 

 
 

WARNING

WARNING

Содержание Q4P09H

Страница 1: ...odels Q4P09H Q4P09X Q4P09W 9 000 lb Capacity 200 Cabel Street P O Box 3972 Louisville Kentucky 40201 3972 Email sales qualitylifts com Web site www qualitylifts com Office 877 771 5438 502 583 5438 Fa...

Страница 2: ...max G Width of Runways 20 20 20 H Width Between Runways 38 38 38 I Rise Height of Runway Top at Top Lock Position allow 2 3 8 of clearance above top vehicle for lock release 73 85 85 Clear Height Unde...

Страница 3: ...Models Q4P09H Q4P09X Q4P09W Installation Operation and Maintenance 3 Rev 12 26 13 Q4P09 IOM Q doc Fig 2 Drive Under Height...

Страница 4: ...ance property damage or personal injury LOCATION This lift has been evaluated for indoor use only with an operating ambient temp range of 5 40 C 41 104 F ELECTRICAL REQUIREMENTS For lift installation...

Страница 5: ...S Y 7 1 POWER UNIT 8 2 FRONT WHEEL STOP 9 2 REAR WHEEL STOP 10 1 MECHANICAL LOCK BAR 11 8 SHIPPING HARDWARE 12 2 SHIPPING BRACKET WELD INSTALLATION IMPORTANT Always wear safety glasses while installin...

Страница 6: ...ay 7 Lay the cross beams on the runway per Fig 5 Place cardboard between the runway and cross beam Slide the column over the ends of the slide blocks on the cross beam Repeat for each column 8 With he...

Страница 7: ...6 At the front of the power runway continue routing cable 3 around the sheave and out the front drivers side cross beam Cable 4 should be routed around the sheave out to the passenger side front cross...

Страница 8: ...er it may be necessary to loosen or remove the bolts holding the top cap to the column so the bottom nut can be adjusted Fig 15 Lock Ladder Assembly Fig 16 Cable Jam Nut 24 Secure the cables to the to...

Страница 9: ...er Unit to the column using the supplied M8x20mm bolts and M8 nuts The power unit can be installed on either the front or side of the power column to suit install location shown in Fig 17 Fig 17 Power...

Страница 10: ...runway to verify that the cable lugs are resting firmly against the cylinder pull bar 42 To level the runways and crossbeams use a 4 ft level With the lift resting in its locks find the highest corner...

Страница 11: ...ion Inspection and Maintenance and the employer shall insure that the lift inspectors are qualified and that they are adequately trained in the inspection of the lift The Owner Employer shall establis...

Страница 12: ...fully lower the lift to release hydraulic pressure on the system LOSS OF POWER If for any reason the lift will not raise off the locks or the locks will not retract consult factory authorized personn...

Страница 13: ...ig 28 Fig 28 Jack Tray MOBILITY KIT Q4P09CS 1 This set of four casters when attached to the cross beams of an unloaded lift Fig 29 pick the lift up and allow it to be rolled to a different location Fi...

Страница 14: ...ded in the kit and the lock washer and washer from the previous step Fig 31 Note the location of flange head bolt in Fig 31 Repeat for other runway Fig 31 Base Installation 4 Turn the ramp over and in...

Страница 15: ...IOM Q doc Parts Breakdown Models Q4P09H Q4P09X Q4P09W IMPORTANT Replace all worn or broken parts with genuine Quality Lifts Inc parts Contact your local Quality Lifts Parts Distributor for pricing and...

Страница 16: ...Models Q4P09H Q4P09X Q4P09W Installation Operation and Maintenance 16 Rev 12 26 13 Q4P09 IOM Q doc Parts Breakdown Fig A General Layout...

Страница 17: ...T RETURN 13 JSZ5 5 10 03 1 HOSE HYDRAULIC CYLINDER 14 TCS4 07 07 1 STRAIGHT HYD FITTING 15 TCS4 03 00 1 HYDRAULIC CYLINDER ASSEMBLY Q4P09H TCS4A 03 00 Q4P09X W 16 JSZ5 5 10 06 2 M14x1 5 BULKHEAD NUT 1...

Страница 18: ...8 Q4P09 H TCS4A 11 03 332 Q4P09 X TCS4B 11 03 339 Q4P09 W 33D TCS4 11 01 1 DRIVER SIDE REAR CABLE Cable 1 117 1 8 Q4P09 H TCS4A 11 01 129 Q4P09X TCS4B 11 01 136 Q4P09W 34 TCS4 01 03 00 4 LOCK LADDER Q...

Страница 19: ...SHEAVE ASSEMBLY 47 TCS4 07 04 00 4 SHEAVE PIN ASSEMBLY RUNWAY 48 B31188 4 M8 x 16mm Lg HEX LOCKING FLG HD CAP SCREW 49 TCS4 07 03 2 RUNWAY SHEAVE SPACER TALL 50 TCS4 07 02 2 RUNWAY SHEAVE SPACER SHORT...

Страница 20: ...Models Q4P09H Q4P09X Q4P09W Installation Operation and Maintenance 20 Rev 12 26 13 Q4P09 IOM Q doc PARTS BREAKDOWN continued Fig D Cross Beams...

Страница 21: ...S4B 04 09 Q4P09W 71 TCS4 04 06 4 LOCK ROD CLEVIS 72 TCS4 04 07 00A 2 MECHANICAL LOCK COUPLER 73 TCS4 04 05 1 LOCK SPACER 74 TCS4 04 04 00A 1 MECHANICAL LOCK HANDLE 75 TCS4 04 12 2 LOCK COUPLER PIVOT P...

Страница 22: ...Q4P09 IOM Q doc Caster Assembly ITEM PART QTY ASSY DESCRIPTION 92 TCS4 06 01 00A 1 Caster Weldment 93 TCS4 06 03 1 Caster Wheel 94 X10 077 4 Bolt M10 x 25mm Long 95 X10 019 4 Nut M10 96 X10 073 4 Wash...

Страница 23: ...STATE _________ ZIP ___________ CUSTOMER INFORMATION COMPANY NAME _______________________________________________ CONTACT _____________________________________________________ PHONE NUMBER ___________...

Отзывы: